ins.: 2022-12-07 13:10, 3 yrs ago

Category:
DIVE

DIVE: 2022-12-02
A quiet day on site spent mostly with data

A quiet day on site, spent mostly with data processing and analysis, storing the outflowing fluid, and tidying the compound. All data seem to point to steeply dipping foliation, a joint interpretation is in preparation to put everything in perspective. On this note, the photo shows our DT-1b site from – 200 m depth.
- Links:
- https://