ins.: 2022-12-06 13:10, 3 yrs ago

Category:
DIVE

DIVE: 2022-12-06
Fixing the wireline winch at current borehole depth of 522.4 m

A new tramway line to the drilling site? No, just fixing the wireline winch. The 200th core was extracted, and some euhedral sulphide crystals found inside a fracture. Current borehole depth is 522.4 m.
- Links:
- https://