(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-15 ˇ
The power supply was not normal recently So the
The power supply was not normal recently. So the DIS could not work normally. The geologists scanned only two pieces of cores today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-14 ˇ
Shengli Geologging Company developed a degassing and analysing system
Shengli Geologging Company developed a degassing and analysing system for low level content of Hydron, Helium and other components from the natrual gas. The image of today shows the equipment for degassing in a seal mud system. A mud auto-sampling unit is mounted in it. The unit can collect mud sample when any gas with the high concentration is over a threshold and detected by the on-line gas analyzers. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-13 ˇ
The appraisal meeting on the degasing system of Shengli
The appraisal meeting on the degasing system of Shengli Geologging Company was held today. The meeting was chaired by our chief geologist Mr. Yang Jingsui. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-12 ˇ
CCSD has attracted a lot of people We received
CCSD has attracted a lot of people. We received three group of visitors this afternoon. Also we got a beautiful greeting card and letter from Mr. Liu Guangzhi and his wife. Mr. Liu is a famous and respected expert in drilling in China. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-11 ˇ
We reached a depth of 1141.25m up to 4
We reached a depth of 1141.25m up to 4:00 am today. The rock was very hard in the last two or three days, so the drilling efficiency was very low. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-10 ˇ
A new seal degasing system was developped by Shengli Geologging Company.
A new seal degasing system was developped by Shengli Geologging Company. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-09 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-08 ˇ
Today nearly 20 officials from Jiangsu Province, Lianyungang City and local Donghai County visited...
Today nearly 20 officials from Jiangsu Province, Lianyungang City and local Donghai County visited CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-07 ˇ
The CCSD scientists are preparing for the systematic sampling
The CCSD scientists are preparing for the systematic sampling. Also we are going to transport all the cores to the newly built storeroom of cores. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-06 ˇ
Last night we had a small problem with electricity
Last night we had a small problem with electricity, but it was not a big deal. Today it seems ok. The weather is also becoming ok now. Perhaps we will have a good luck. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-04 ˇ
Taday we accepted officials from scientific orgnization of Jiangsu province.
Taday we accepted officials from scientific orgnization of Jiangsu province. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-03 ˇ
Today it rained all day long From today we
Today it rained all day long. From today, we will present series new results from CCSD Project at this website. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-02 ˇ
It is said that our chief geologist is coming
It is said that our chief geologist is coming tomorrow. So we payed great attention to our work and did our logging more carefully and harder. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-01 ˇ
Our CCSD atracts many people from all walks of life to visit the drilling site.
Our CCSD atracts many people from all walks of life to visit the drilling site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-30 ˇ
Today it is sunny after serveral cloudy and cold days.
Today it is sunny after serveral cloudy and cold days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-29 ˇ
work is going smoothly
work is going smoothly (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-28 ˇ
Today is a cold day, but our project runs very warmly and smoothly.
Today is a cold day, but our project runs very warmly and smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-27 ˇ
The winter comes here at our dilling site in
The winter comes here at our dilling site in Donghai county where the temperature is around 0 degree centigrade in the night, but our drillers are working cntinuously to get the core of high recovery of more than 98% although the depth is mor than 1000 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-26 ˇ
Mr Tian Fengshan and Madam Shou Jiahua Minister and
Mr. Tian Fengshan and Madam Shou Jiahua, Minister and vice Minister of Ministry of Land and Mineral Resouces(MLMR),visited the science and technology exhibition of Ninth Five-year Plan of MLMR. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-25 ˇ
Hard working and easy entertainment
Hard working and easy entertainment (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-24 ˇ
A day of fractured cores.
A day of fractured cores. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-23 ˇ
A day of fractured cores.
A day of fractured cores. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-22 ˇ
The drillers of CCSDP borehole meet a very hard
The drillers of CCSDP borehole meet a very hard problom of slow panetration that is caused by very hard rock-----high quartz content granitic gneiss. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-21 ˇ
After several days of busy work, today Madam Xu (PI) left here to Beijing for a meeting .
After several days of busy work, today Madam Xu (PI) left here to Beijing for a meeting . (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-20 ˇ
We hold the daily meeting every day Today Madam
We hold the daily meeting every day. Today, Madam Xu(PI), Mr. Ni (the vice director ), the Chief Geologist and the Genneral Engineer were present at the meeting. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-18 ˇ
Today is really a busy day for us We
Today is really a busy day for us. We have to wait until 3 oclock this morning to get the core of 1000m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-17 ˇ
Today we have three big news Firstly the depth
Today we have three big news: Firstly, the depth of CCSD Pilot Hole reached 1000 m at 22:36:48. Secondly, we can use DIS without the account of our domain controller. Our network and DIS are more safely. Thirdly, the website of CCSD updated sucessfully. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-16 ˇ
Two experts from Geolphysical Society of China and one
Two experts from Geolphysical Society of China and one from Geology Institute of Chinese Academy of Geological Sciences are using the Natural Electromagnetic Radiation Sounding appratus to determine the depth of the underground geological bodies. The depth CCSD Pilot Hole is reaching 1000 m. The framework of CCSD website is nearly ready. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-15 ˇ
Most of the CCSD members are busy these days
Most of the CCSD members are busy these days. Today's drilling met some problems. So we got less cores today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-14 ˇ
Madem Xu is working with us in CCSD drilling
Madem Xu is working with us in CCSD drilling site. She will give a presentation to the Ministry of Land and Mineral Resources of China. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-13 ˇ
We have made the decision that we will send
We have made the decision that we will send the daily report everyday since today. And we are preparing to enter the core descriptions using DIS. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-12 ˇ
The data center of CCSD project is busying in
The data center of CCSD project is busying in building the website of CCSD project and training our members to use the DIS and our information system. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-11 ˇ
After a busy day , it becomes quiet here.
After a busy day , it becomes quiet here. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-10 ˇ
Everything is normal .
Everything is normal . (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-09 ˇ
This core was inspected by Chief Scientist Madam Xu Zhiqin
This core was inspected by Chief Scientist Madam Xu Zhiqin (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-08 ˇ
Today the formation we drilled is getting hard and hard
Today the formation we drilled is getting hard and hard (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-07 ˇ
The drilling website of drilling engineering department is making now.
The drilling website of drilling engineering department is making now. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-06 ˇ
The core is rather broken. That let our drillers to difficulty situation to get high quality core...
The core is rather broken. That let our drillers to difficulty situation to get high quality core for geologists. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-05 ˇ
The new type coring tool which is made by
The new type coring tool which is made by The Institute of Drilling Techniques of Shengli Oil-field will be put in CCSD-P1. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-04 ˇ
New hydro hammer was designed by the College of
. New hydro-hammer was designed by the College of Constructing Engineering of Jilin University and made in Wuxi Drilling Tools Factory. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-03 ˇ
The down hole drilling parameters recorder is used to
The down-hole drilling parameters recorder is used to record the deviation, down-hole temperature, and down-hole pressure of the drilling fluid. It was designed and made by Engineering College of China University of Geoscience. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-02 ˇ
Down hole motors are used in core drilling The
Down-hole motors are used in core drilling. The down-hole motors we used are made in Beijing Petroleum Manufactory. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-11-01 ˇ
Miss. Shi who comes form China Geological University as a volunteer was inputting the daily report.
Miss. Shi who comes form China Geological University as a volunteer was inputting the daily report. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-10-31 ˇ
Everything is normal.
Everything is normal. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-10-29 ˇ
After 2 rain days, today is sun shine.
After 2 rain days, today is sun shine. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-10-26 ˇ
After 12 hours hard work the drilling crew which
After 12 hours hard work, the drilling crew which comes form the 3th drilling company of Zhongyuan Petroleum Exploration Bureau of SINOPEC are off duty.