CCSDP/Donghai: 2005-03-08 ˇ
Congratulations! Ccsd, the final depth of the borehole is 5158.00m at March 8, 2005.
Congratulations! Ccsd, the final depth of the borehole is 5158.00m at March 8, 2005. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-03-04 ˇ
Binary file (standard input) matches
Binary file (standard input) matches - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-03-03 ˇ
The direct Wang Da the chief engineer Zhang Wei
The direct Wang Da, the chief engineer Zhang Wei and some other engineers are going to Lankao to see about the new drill mast tomorrow. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-03-02 ˇ
The loggers will arrived at tomorrow morning, who will log the natural gamma of the borehole next...
The loggers will arrived at tomorrow morning, who will log the natural gamma of the borehole next run. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-02-23 ˇ
Today is Chinese traditional festival of lanterns; all of the engineers and drillers at ccsd still...
Today is Chinese traditional festival of lanterns; all of the engineers and drillers at ccsd still work hard. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-02-22 ˇ
Drilling goes on well.
Drilling goes on well. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-28 ˇ
The drillers are cleaning the dust on the drilling mast.
The drillers are cleaning the dust on the drilling mast. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-27 ˇ
Some guests from SINOPEC came to CCSD drill site visited the geological museum and drill site.
Some guests from SINOPEC came to CCSD drill site visited the geological museum and drill site. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-26 ˇ
We began to test wire-line coring system.
We began to test wire-line coring system. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-25 ˇ
Making preparations for wire-line coring.
Making preparations for wire-line coring. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-24 ˇ
Laying down drill pipes.
Laying down drill pipes. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-23 ˇ
The depth of MH-2C reached 5118.20 m, the footage was 6.43m.
The depth of MH-2C reached 5118.20 m, the footage was 6.43m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-22 ˇ
Seven engineers left ccsd drill site today.
Seven engineers left ccsd drill site today. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-21 ˇ
The depth of CCSD MH reached 5107.63 m at 4 a.m.
The depth of CCSD MH reached 5107.63 m at 4 a.m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-20 ˇ
Logging was completed,We begin to continue drilling.
Logging was completed,We begin to continue drilling. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-19 ˇ
According the electrical logging result, the inclination angle of borehole reached 29 degrees.
According the electrical logging result, the inclination angle of borehole reached 29 degrees. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-18 ˇ
Some logging engineers from SchlumBerger CO. arrived at CCSD drill site.
Some logging engineers from SchlumBerger CO. arrived at CCSD drill site. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-17 ˇ
Mass spectro device in Fluid Lab was repaired. Now a few data was gotten by it.
Mass spectro device in Fluid Lab was repaired. Now a few data was gotten by it. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-16 ˇ
Logging was hindered at the depth of 4010 m. We had to redress.
Logging was hindered at the depth of 4010 m. We had to redress. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-15 ˇ
The logging engineers began to log the borehole MH-2C today.
The logging engineers began to log the borehole MH-2C today. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-14 ˇ
Just after CCSD MH reached the designed depth a
Just after CCSD MH reached the designed depth, a special wedding ceremony was held at CCSD drill site for four couples from drilling companies. They have done a lot for CCSD project. So they chose the ceremony on the special day and at the special place. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-13 ˇ
The depth of CCSD MH reached 5102.18 m at
The depth of CCSD MH reached 5102.18 m at 4 a.m. this morning. A small celebration was held at drill site. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-12 ˇ
Madam Xu Zhiqin and other six scientists came here
Madam Xu Zhiqin and other six scientists came here from Beijing this morning. In the afternoon, Mr. Wang Da led several engineers also came here from Beijing. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-11 ˇ
Coring from 5083.52m to 5084.46m.
Coring from 5083.52m to 5084.46m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-10 ˇ
Coring from 5075.16m to 5083.52m.
Coring from 5075.16m to 5083.52m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-09 ˇ
The cat is at the drill site
The cat is at the drill site - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-07 ˇ
Beautiful the setting sun.
Beautiful the setting sun. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-06 ˇ
Drilling goes on well.
Drilling goes on well. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-05 ˇ
Drilling goes on well.
Drilling goes on well. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-04 ˇ
The concentration of carbon dioxide rose up.
The concentration of carbon dioxide rose up. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-03 ˇ
Today,Some new drill pipes centralizers were transported to drill-site.
Today,Some new drill pipes centralizers were transported to drill-site. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-02 ˇ
A lot of small cores.
A lot of small cores. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2005-01-01 ˇ
January 1, the first day of the year, celebrated as a holiday in many countries.
January 1, the first day of the year, celebrated as a holiday in many countries. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-31 ˇ
Drilling goes on well and we got 7.35m footage today.
Drilling goes on well and we got 7.35m footage today. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-30 ˇ
Drill pipes were stuck at trip out.
Drill pipes were stuck at trip out. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-29 ˇ
Driller is climbing the drilling mast.
Driller is climbing the drilling mast. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-28 ˇ
Mr. Guo Liming, the member of datacenter arrived at drill-site in the evening.
Mr. Guo Liming, the member of datacenter arrived at drill-site in the evening. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-27 ˇ
Drilling goes on well and we got 9.30m footage today.
Drilling goes on well and we got 9.30m footage today. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-26 ˇ
Today the power supply was interrupted because of checking.
Today the power supply was interrupted because of checking. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-25 ˇ
The expert Mr. Niu Yixiong finished the meeting about logging in Beijing and came back to ccsd...
The expert Mr. Niu Yixiong finished the meeting about logging in Beijing and came back to ccsd drillsite today. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-24 ˇ
Today is Christmas Eve. Give best wishes to everybody who joins in the CCSD project.
Today is Christmas Eve. Give best wishes to everybody who joins in the CCSD project. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-23 ˇ
Little footage today.
Little footage today. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-22 ˇ
New Year is coming; we are going to write some postcards to our friends and relatives.
New Year is coming; we are going to write some postcards to our friends and relatives. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-21 ˇ
It is wonderful that the depth of the borehole reached 5000m at 14:16 on 21st December.
It is wonderful that the depth of the borehole reached 5000m at 14:16 on 21st December. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-20 ˇ
The depth 5000m of the borehole is coming.
The depth 5000m of the borehole is coming. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-19 ˇ
Drilling goes on well and the depth of the borehole is 4983.46m.
Drilling goes on well and the depth of the borehole is 4983.46m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-18 ˇ
Drilling goes on well except hindered occasionally. The experts decide to log the borehole at the...
Drilling goes on well except hindered occasionally. The experts decide to log the borehole at the depth of 5100m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-17 ˇ
Today, drilling goes on well and the depth of the borehole is 4974.16m.
Today, drilling goes on well and the depth of the borehole is 4974.16m. - (inserted: 30.09.2022 17:41)
CCSDP/Donghai: 2004-12-16 ˇ
Drilling goes on well and we get 7.16m footage.
Drilling goes on well and we get 7.16m footage.