(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-15 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-15 ˇ
Mr. Zhan Xiaoxi, the vice chief engineer came back and Mr. Zhang wei left for Beijing today.
Mr. Zhan Xiaoxi, the vice chief engineer came back and Mr. Zhang wei left for Beijing today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-13 ˇ
Today, drilling goes on well as usual.
Today, drilling goes on well as usual. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-12 ˇ
There was something wrong with a part of network, after checking, it works well now.
There was something wrong with a part of network, after checking, it works well now. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-11 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-10 ˇ
Drilling goes on well and the footage is 7.36m today.
Drilling goes on well and the footage is 7.36m today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-09 ˇ
Drilling goes on well today and the depth of the borehole is 4924.80m.
Drilling goes on well today and the depth of the borehole is 4924.80m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-08 ˇ
Mr. Su and the visitors of Xian Institute of earth environment CAS left here yesterday.
Mr. Su and the visitors of Xian Institute of earth environment CAS left here yesterday. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-07 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-06 ˇ
Logging engineers will arrive tomorrow to log the borehole MH-2C.
Logging engineers will arrive tomorrow to log the borehole MH-2C. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-05 ˇ
The concentration of carbon dioxide and hydrogen remain high.
The concentration of carbon dioxide and hydrogen remain high. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-04 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-03 ˇ
A visitor Jiang boming from Taiwan province of China
A visitor Jiang boming from Taiwan province of China and Mr. Su Dechen, the master of datacenter came to CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-02 ˇ
The concentration of carbon dioxide was abnormal which rose up much higher than before.
The concentration of carbon dioxide was abnormal which rose up much higher than before. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-12-01 ˇ
Drilling went on well except little sticking at the
Drilling went on well except little sticking at the depth of 4882m. And we will log the borehole at the depth of 4900m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-30 ˇ
At the morning meeting, the experts and engineers discussed the relation between the abnormity of...
At the morning meeting, the experts and engineers discussed the relation between the abnormity of carbon dioxide and mud. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-29 ˇ
We lost nearly 20 cubic meters mud at this
We lost nearly 20 cubic meters mud at this run. In order to prevent it, some chemical treating was added to mud. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-28 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-27 ˇ
The copycat was broken. And the engineers form Lianyungang came to repair it in the afternoon.
The copycat was broken. And the engineers form Lianyungang came to repair it in the afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-27 ˇ
About 8 cubic meters mud have been lost recently.
About 8 cubic meters mud have been lost recently. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-26 ˇ
It snowed today and the whether turn cold. We got no footage.
It snowed today and the whether turn cold. We got no footage. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-25 ˇ
The drilling goes on well today. And the footage of the borehole is 6.24m.
The drilling goes on well today. And the footage of the borehole is 6.24m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-24 ˇ
Madam Xu Zhiqin and Madam Caici left ccsd drill site in the evening.
Madam Xu Zhiqin and Madam Caici left ccsd drill site in the evening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-23 ˇ
The concentration of carbon dioxide rose up and reached less than 36074 ppm.
The concentration of carbon dioxide rose up and reached less than 36074 ppm. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-22 ˇ
Mr Lu Xinshe Vice Minister of Ministry of Land
Mr. Lu Xinshe, Vice Minister of Ministry of Land and Resources of China arrive at CCSD drill-site and visit the geological museum. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-21 ˇ
Some guests from Jiangsu Geology and Mineral Resources Prospecting
Some guests from Jiangsu Geology and Mineral Resources Prospecting Bureau came to CCSD drill site visited the geological museum and drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-20 ˇ
We reached the depth of 4825.88m. Nearly 2.5 steres mud is lost.
We reached the depth of 4825.88m. Nearly 2.5 steres mud is lost. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-19 ˇ
The concentration of carbon dioxide rose up and reached less than 3028 ppm.
The concentration of carbon dioxide rose up and reached less than 3028 ppm. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-18 ˇ
It took about 18 hours to core drilling for the151th run.
It took about 18 hours to core drilling for the151th run. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-17 ˇ
We reached the depth of 4809.54m. Nearly 8 steres mud is lost.
We reached the depth of 4809.54m. Nearly 8 steres mud is lost. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-16 ˇ
We and longest drill core take a group photo today,It is 4.25m long.
We and longest drill core take a group photo today,It is 4.25m long. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-15 ˇ
The depth of well MH-2C reached 4800m in the morning today.
The depth of well MH-2C reached 4800m in the morning today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-14 ˇ
The depth of well MH-2C reached 4794.97m in the morning today.
The depth of well MH-2C reached 4794.97m in the morning today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-13 ˇ
It rains today, it is very cold too.
It rains today, it is very cold too. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-12 ˇ
Some guests from Tianjin Geology and Mineral Resources Prospecting
Some guests from Tianjin Geology and Mineral Resources Prospecting Bureau came to CCSD drill site visited the geological museum and drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-11 ˇ
CCSD Project center has obtained Shanghai International Industry Fair issuing to especially...
CCSD Project center has obtained Shanghai International Industry Fair issuing to especially participate in the award. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-10 ˇ
Logging has completed and the inclination angle of borehole MH-2C changes less.
Logging has completed and the inclination angle of borehole MH-2C changes less. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-09 ˇ
The engineers are going to take an electrical logging today.
The engineers are going to take an electrical logging today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-08 ˇ
Coring form 4750.68m to 4758.32m.
Coring form 4750.68m to 4758.32m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-07 ˇ
Mr Meng xianlai director general of china geological survey
Mr. Meng xianlai , director general of china geological survey came to CCSD drill site visited the geological museum and drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-06 ˇ
dozen of academicians and experts from Chinese academy of
dozen of academicians and experts from Chinese academy of sciences and Chinese academy of engineering came to CCSD drill site visited the geological museum and drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-04 ˇ
The depth of well MH-2C reached 4732.22m in the morning today.
The depth of well MH-2C reached 4732.22m in the morning today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-03 ˇ
A lot of small cores were recovered today According
A lot of small cores were recovered today. According to the length of cores, we considered the bit run well. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-02 ˇ
Some engineers have gone to Shanghai to join the exhibition of CCSDP in the morning.
Some engineers have gone to Shanghai to join the exhibition of CCSDP in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-11-01 ˇ
We bought the broadband router prepare for insert the new network.
We bought the broadband router prepare for insert the new network. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-31 ˇ
They are inspecting the remote control console.
They are inspecting the remote control console. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-30 ˇ
The depth of well MH-2C reached 4700m in the morning today.
The depth of well MH-2C reached 4700m in the morning today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-29 ˇ
Lots of old geological experts came to CCSD, The chief engineer Zhang Wei made a brief introduction...
Lots of old geological experts came to CCSD, The chief engineer Zhang Wei made a brief introduction to them. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-28 ˇ
The director Wang Da came to CCSD drill site today.
The director Wang Da came to CCSD drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-27 ˇ
The depth of PH-2K reached 4682.66 m, the footage was 9.31m.
The depth of PH-2K reached 4682.66 m, the footage was 9.31m.