(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-05-02 ˇ
The footage of today is nearly 20m.
The footage of today is nearly 20m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-05-01 ˇ
Today was May Day But we had to stay
Today was May Day. But we had to stay in for preventing the SARS. In the evening, we had a good dinner together. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-30 ˇ
A basketball match was held between drilling contractor and us. At last we won the match.
A basketball match was held between drilling contractor and us. At last we won the match. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-29 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-28 ˇ
Current depth is 2797.01m. The 11th run of sidetracking has been finished.
Current depth is 2797.01m. The 11th run of sidetracking has been finished. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-26 ˇ
We continue angle drop drilling using tri-cone bit and bent-housing/PDM.
We continue angle drop drilling using tri-cone bit and bent-housing/PDM. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-25 ˇ
After sidetracking and enlarging the hole, a coring run was conducted.
After sidetracking and enlarging the hole, a coring run was conducted. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-24 ˇ
We were told to stay at drill-site for longer time because of SARS. This would benefit our health.
We were told to stay at drill-site for longer time because of SARS. This would benefit our health. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-23 ˇ
After a section of the hole was drilled using smaller sidetracking bit, we began to open the hole.
After a section of the hole was drilled using smaller sidetracking bit, we began to open the hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-22 ˇ
According to the logging results the inclination angle of
According to the logging results, the inclination angle of the hole has been reduced about 3 degrees in a borehole section of 17m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-21 ˇ
Several colleagues left here for taking an examination.
Several colleagues left here for taking an examination. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-20 ˇ
A new bit was carried to drill-site, it will be used for sidetracking.
A new bit was carried to drill-site, it will be used for sidetracking. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-19 ˇ
Some teachers from China University of Mining and Technology visited drill-site.
Some teachers from China University of Mining and Technology visited drill-site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-18 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-17 ˇ
Mr. Li Zhijian, the deputy director of Department of International Cooperation and Scientific and...
Mr. Li Zhijian, the deputy director of Department of International Cooperation and Scientific and Technology, visited drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-16 ˇ
An accumulator added to water supply system to ensure the stabilization of water supply pressure.
An accumulator added to water supply system to ensure the stabilization of water supply pressure. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-15 ˇ
A piece of steel plate was welded to the
A piece of steel plate was welded to the bending sub below the down hole motor to expect to get larger side force during sidetracking. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-14 ˇ
Professor Yang Wencai, the vice director of CCSD, arrived at drill-site today.
Professor Yang Wencai, the vice director of CCSD, arrived at drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-13 ˇ
The first run of sidetracking finished some cuttings ware
The first run of sidetracking finished, some cuttings ware got. Next step we planed to measure the deviation of the borehole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-12 ˇ
General Kui Fulin the vice chief of staff from
General Kui Fulin, the vice-chief of staff from National General Staff, visited drill-site accompanied by some officers of local military district. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-11 ˇ
Continue sidetracking.
Continue sidetracking. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-10 ˇ
After cement, we began sidetracking with a special diamond bit.
After cement, we began sidetracking with a special diamond bit. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-09 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-08 ˇ
Diamond bit expert Zhao Erxin arrived at drill site
Diamond bit expert Zhao Erxin arrived at drill-site this morning to discuss what type of bites and stabilizer should be used in coming sidetracking, with local drilling engineers. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-07 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-06 ˇ
The air temperature has risen, farmers started their spring plowing.
The air temperature has risen, farmers started their spring plowing. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-05 ˇ
The logging program started. It will continue two days.
The logging program started. It will continue two days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-04 ˇ
The special guests, children who came from a local kindergarten, visited drill-site under the...
The special guests, children who came from a local kindergarten, visited drill-site under the guiding of their teachers. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-03 ˇ
Mr Cao Xianghong vice president of Sinopec Corporation that
Mr. Cao Xianghong, vice president of Sinopec Corporation that is the Contractor of CCSD Project, visited the drilling site today to show the honor to his employees working in the project. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-02 ˇ
Nearly 8m cores were got.
Nearly 8m cores were got. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-04-01 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-31 ˇ
The drilling engineer group has a meeting on determination of sidetracking the hole to correct the...
The drilling engineer group has a meeting on determination of sidetracking the hole to correct the borehole deviation. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-30 ˇ
Current depth is 2937.49m. The inclination of the borehole went up to 15.63 degrees in 2935m.
Current depth is 2937.49m. The inclination of the borehole went up to 15.63 degrees in 2935m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-29 ˇ
A motor coach from local tourist agency arrived here
A motor coach from local tourist agency arrived here today. It is obvious that our drill-site has become a sightseeing spot. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-28 ˇ
A troupe from Zhongyuan Petroleum Exploration Bureau arrived at
A troupe from Zhongyuan Petroleum Exploration Bureau arrived at drill-site this morning. They gave a wonderful performance to their drilling team and us. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-27 ˇ
Nearly 30 persons from National Metallurgic Geological Bureau visited
Nearly 30 persons from National Metallurgic Geological Bureau visited drill-site today. Chief engineer Zhang Wei introduced the progress of CCSDP to them in meeting room. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-26 ˇ
The concentration of methane, helium, carbon dioxide rose up together.
The concentration of methane, helium, carbon dioxide rose up together. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-25 ˇ
A electrical logging was held. The declination of the borehole rose to 13 degrees.
A electrical logging was held. The declination of the borehole rose to 13 degrees. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-24 ˇ
The concentration of methane gas rose up to 7000 ppm, the addition of mud was the main reason.
The concentration of methane gas rose up to 7000 ppm, the addition of mud was the main reason. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-23 ˇ
The footage of today was 12.98 m. The average footage of these days was quite high.
The footage of today was 12.98 m. The average footage of these days was quite high. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-22 ˇ
The depth of today was 2866.96 m ant the footage was 10.77 m.
The depth of today was 2866.96 m ant the footage was 10.77 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-21 ˇ
After two days of hard work, all the photos of CCSD MH core boxes were entered into DIS.
After two days of hard work, all the photos of CCSD MH core boxes were entered into DIS. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-20 ˇ
The depth of today was 2846.88 m Most people
The depth of today was 2846.88 m. Most people had been discussing or reading the news about the war between US and Iraq. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-19 ˇ
Geologists finished the scanning of cores from Run 135
Geologists finished the scanning of cores from Run 135. The depth of today was 2837.58 m. The officials from local Construction Bank planted two valuable trees for CCSD. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-18 ˇ
It was a very clear day. Local peasants were hired to plant some trees for CCSD.
It was a very clear day. Local peasants were hired to plant some trees for CCSD. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-18 ˇ
The depth of today was 2828.83 m.
The depth of today was 2828.83 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-17 ˇ
Current depth at 4 am today was 2820.63 m
Current depth at 4 am today was 2820.63 m. Some officials from the National Natural Science Foundation of China (NSFC) visited our drilling site. We will send the photos tomorrow. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-15 ˇ
The corrected web pages were uploaded to ICDP website yesterday evening. Cores began normal now...
The corrected web pages were uploaded to ICDP website yesterday evening. Cores began normal now these days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-03-14 ˇ
Some errors of CCSD web pages of Dec.10 2002 were found and corrected. Current depth was 2797.79m.
Some errors of CCSD web pages of Dec.10 2002 were found and corrected. Current depth was 2797.79m.