(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-03-05 ˇ
We begin to build an experimental borehole near the
We begin to build an experimental borehole near the CCSD drill site. All the equipments have already arrived in the afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-03-04 ˇ
A basketball match was held between 70101 drilling team and county's propaganda department in the...
A basketball match was held between 70101 drilling team and county's propaganda department in the afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-03-03 ˇ
Today, two engineers came to check the across voltage protector of data center.
Today, two engineers came to check the across voltage protector of data center. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-03-02 ˇ
Today, we took some photos of an old core for front cover of a magazine.
Today, we took some photos of an old core for front cover of a magazine. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-03-01 ˇ
The engineers held a meeting to discuss how to resolve the touch sticking in this morning.
The engineers held a meeting to discuss how to resolve the touch sticking in this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-29 ˇ
Today, It took a long time to redress the borehole of MH-2K.
Today, It took a long time to redress the borehole of MH-2K. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-28 ˇ
Two guests from Beijing visited CCSD drill site and the labs.
Two guests from Beijing visited CCSD drill site and the labs. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-27 ˇ
The drillers at mast are checking drilling equipments when longing.
The drillers at mast are checking drilling equipments when longing. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-26 ˇ
Today, the logging program started. We recorded the course of logging.
Today, the logging program started. We recorded the course of logging. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-25 ˇ
Some logging experts from Germany come to drill site today and they are going to log well tomorrow.
Some logging experts from Germany come to drill site today and they are going to log well tomorrow. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-24 ˇ
Today a teacher and his students from university of
Today, a teacher and his students from university of science and technology Hefei came to ccsd drill site for sampling. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-23 ˇ
The new drilling pipes were carried to CCSD drill site.
The new drilling pipes were carried to CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-22 ˇ
The displays repaired in Beijing were transported to drill site today.
The displays repaired in Beijing were transported to drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-21 ˇ
It took a long time to redress the borehole of MH-2K today.
It took a long time to redress the borehole of MH-2K today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-20 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-19 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-18 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-17 ˇ
Today drilling recovered normally.The wire rope were transported to drill site in the afternoon.
Today drilling recovered normally.The wire rope were transported to drill site in the afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-16 ˇ
Today the depth of enlarging borehole is 3404.90 m and reaming in all-day,
Today the depth of enlarging borehole is 3404.90 m and reaming in all-day, (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-16 ˇ
We checked the fire-fighting equipment.
We checked the fire-fighting equipment. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-15 ˇ
Mr. Zhang Xiaoxi, the vice chief engineer arrived at the drill-site today.
Mr. Zhang Xiaoxi, the vice chief engineer arrived at the drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-14 ˇ
Today the depth of enlarging borehole is 3391.33m and the hyperbaric mud was poured at the depth of...
Today the depth of enlarging borehole is 3391.33m and the hyperbaric mud was poured at the depth of 2500m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-13 ˇ
This morning a meeting was held. The Drilling experts and engineers discussed how to solve the...
This morning a meeting was held. The Drilling experts and engineers discussed how to solve the problem when drilling. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-12 ˇ
A young man named Guo Liming who is a
A young man named Guo Liming who is a new member of Data center arrived at ccsd drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-11 ˇ
Many log engineers arrived at ccsd drill-site today.
Many log engineers arrived at ccsd drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-10 ˇ
Drilling went on well today except bit bouncing once in a while.
Drilling went on well today except bit bouncing once in a while. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-09 ˇ
Drilling of enlarging the borehole MH-2K went on well in the whole day.
Drilling of enlarging the borehole MH-2K went on well in the whole day. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-08 ˇ
Today drilling recovered normally and we got footage of 21.67m.
Today drilling recovered normally and we got footage of 21.67m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-07 ˇ
There was no footage today. We began to mill the fish with mill shoe recently.
There was no footage today. We began to mill the fish with mill shoe recently. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-06 ˇ
Mr. Jia Jun came back to the ccsd this evening..
Mr. Jia Jun came back to the ccsd this evening.. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-05 ˇ
Today is Chinese festival of lanterns; all of the engineers and drillers at ccsd still work hard.
Today is Chinese festival of lanterns; all of the engineers and drillers at ccsd still work hard. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-04 ˇ
Members of CCSD leading group held a meeting on
Members of CCSD leading group held a meeting on Feb.3.in Beijing. The meeting was presided over by Madam Shou Jiahua, Vice Minister of Ministry of Land and Resources of China. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-03 ˇ
Bit bouncing occurred at the depth of 3314m in run28.
Bit bouncing occurred at the depth of 3314m in run28. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-02 ˇ
The depth of PH-2K reached 3315.04 m and the footage was 21.41 m.
The depth of PH-2K reached 3315.04 m and the footage was 21.41 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-02-01 ˇ
A part of guide was cut off to strengthen the tricone bit
A part of guide was cut off to strengthen the tricone bit (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-31 ˇ
The guide of one tricone bit dropped off and got lost in the bore hole when enlarging the borehole.
The guide of one tricone bit dropped off and got lost in the bore hole when enlarging the borehole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-30 ˇ
Today Mr. Su, Mr. Zhan and some others left CCSD for Beijing this evening.
Today Mr. Su, Mr. Zhan and some others left CCSD for Beijing this evening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-29 ˇ
Today drilling recovered normally and we got footage of 23.76 m.
Today drilling recovered normally and we got footage of 23.76 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-28 ˇ
The footage of today was 4.65 m. Also the weather turned a little wormer.
The footage of today was 4.65 m. Also the weather turned a little wormer. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-27 ˇ
Drillers got some progress. Hope there would be some footage in the very near future.
Drillers got some progress. Hope there would be some footage in the very near future. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-26 ˇ
Today is the fifth day of Chinese Monkey Year
Today is the fifth day of Chinese Monkey Year. The beautiful firecrackers mean the end of the Chinese New Year vocation for most working people. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-25 ˇ
CCSD Director Wang Da left here for Beijing this morning.
CCSD Director Wang Da left here for Beijing this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-24 ˇ
The depth of CCSD MH 2K has been 3230.08
The depth of CCSD MH-2K has been 3230.08 m since Jan.19. Drilling experts has held several meetings to find a proper solution. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-22 ˇ
The celebration continued today The final Ping Pang contest
The celebration continued today. The final Ping Pang contest was held this evening. Mr. Zhang Wei got the first prize. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-21 ˇ
Today was the coldest day The highest degree at
Today was the coldest day. The highest degree at drill site was 3 degrees below zero. It was also very bright. We took many photos and held many activities, such as Ping Pang and basketball contests, Poker contest to celebrate the most important Chinese holiday. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-20 ˇ
Tomorrow will be the last day of Chinese Sheep Year. Most people at drill site are preparing for it.
Tomorrow will be the last day of Chinese Sheep Year. Most people at drill site are preparing for it. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-19 ˇ
The depth of PH-2K reached 3230.48 m, the footage was 4.6 m.
The depth of PH-2K reached 3230.48 m, the footage was 4.6 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-18 ˇ
The depth of PH-2K hole was 3225.48 m.
The depth of PH-2K hole was 3225.48 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-17 ˇ
It was snowing most of the day Everywhere was
It was snowing most of the day. Everywhere was covered by white snow. The Chinese New Year is coming. In the evening, all CCSD members at drill site took part in a short TV program, expressing their regards to all Chinese people. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-16 ˇ
Mr Wang Shouxiang Mr Zhang Hongtao and other officials
Mr. Wang Shouxiang, Mr. Zhang Hongtao and other officials left CCSD drill site for Lianyungan. They also heard the oral reports of local geological bureau and geological team.