Daily News
Project Acronym: CCSDP | State: Completed | Expedition ID: 5004
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-05 ˇ
On Feb 2 the geologists from Geological Division and
On Feb. 2, the geologists from Geological Division and other CCSD members at Beijing and a few CCSD friends hold a New Year Tea Party at the Institute of Geology, Chinese Academy of Geological Sciences. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-04 ˇ
Today we got a longest run of core of nearly 9 m since our drilling started.
Today we got a longest run of core of nearly 9 m since our drilling started. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-03 ˇ
we got a lot of cores today so we
we got a lot of cores today, so we had to work harder and faster to finish our work. T (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-02 ˇ
The DPMA 1 drilling parameters measuring and memory device
The DPMA-1 drilling parameters measuring and memory device that designed and made by Prof. Wu Xiaoming and his assistants Hu Yule, Dufeng was tested while drilling today. The testing result showed us that the device could meet the need of CCSD-PH for measuring while drilling. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-01 ˇ
Today our drilling contractor and the CCSD scientists and engineers held a successfull party..
Today our drilling contractor and the CCSD scientists and engineers held a successfull party.. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-31 ˇ
The image shows the transitional contat between orthogneiss and paragneiss.
The image shows the transitional contat between orthogneiss and paragneiss. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-30 ˇ
Some visitors from Donghai county where our drilling site
Some visitors from Donghai county where our drilling site is located came to to see our drilling rig and residential area. It is new to us all ! (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-29 ˇ
We have moved our core logging room to a bigger place.
We have moved our core logging room to a bigger place. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-28 ˇ
Today some officials from a local government visited our
Today some officials from a local government visited our core logging lab accompanied by on-site vice general director Ni Jialu. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-27 ˇ
Some local officials visited our drlling site and our
Some local officials visited our drlling site and our on-site labs. These officials included the ones from various parts of the county government. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-26 ˇ
Our natural gama mesurement on cores ran well again today after it got a problem about 10 days ago.
Our natural gama mesurement on cores ran well again today after it got a problem about 10 days ago. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-25 ˇ
The artificial seismic explosions around started from today on, which will last a week long period.
The artificial seismic explosions around started from today on, which will last a week long period. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-24 ˇ
Today our drilling ran smoothly and the geophysicits were carrying out the artificial seismic...
Today our drilling ran smoothly and the geophysicits were carrying out the artificial seismic measurement around our drilling site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-23 ˇ
The cores we got today are still fractured seriously.
The cores we got today are still fractured seriously. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-22 ˇ
Today is a happy day for us The 18th
Today is a happy day for us. The 18th engineering logging results showed us that deviation of CCSD-PH is 3.2' at 1430m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-21 ˇ
Everything is normal. We reached a depth of 1426.53m today afternoon.
Everything is normal. We reached a depth of 1426.53m today afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-20 ˇ
Today our drilling contractor established their webpages and published it.
Today our drilling contractor established their webpages and published it. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-19 ˇ
Service engineer Ng Chee Seng who comes from Varco
Service engineer Ng Chee Seng who comes from Varco International Inc. Pte Ltd trained the drillers on the rig floor today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-18 ˇ
Everything is ok. We had a busy day.
Everything is ok. We had a busy day. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-17 ˇ
Today afternoon some visitors came here and visited our
Today afternoon some visitors came here and visited our drillsite. Our expert introduced some drilling and geological information to them. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-16 ˇ
We reached a depth of 1391.15m at 16:12 pm today.Everything is normal.
We reached a depth of 1391.15m at 16:12 pm today.Everything is normal. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-15 ˇ
It had thick fog. We haven't seen sun several days.
It had thick fog. We haven't seen sun several days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-14 ˇ
37 drills reached Donghai yesterday and got ready to drill blast holes for 3D seism.
37 drills reached Donghai yesterday and got ready to drill blast holes for 3D seism. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-13 ˇ
This evening drillers of our contractor and the members
This evening, drillers of our contractor and the members of CCSD held a party at our meeting room. the sweet singing of them filled our headquarters. it is a enjoyable Sunday. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-12 ˇ
The members of the third drilling company and CCSD
The members of the third drilling company and CCSD had a basketball match today afternoon. Others watched it in the break. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-11 ˇ
We bought some chinese chesses that are made with
We bought some chinese chesses that are made with rock crystal. Somebody wanted to present the chinese chess to their friends. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-10 ˇ
We got some broken cores recently. A lot of them can not be scaned. Today things are in good.
We got some broken cores recently. A lot of them can not be scaned. Today things are in good. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-09 ˇ
We reached a depth of 1343.19m at 4:20pm today. But we still didn't scan cores.
We reached a depth of 1343.19m at 4:20pm today. But we still didn't scan cores. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-08 ˇ
We moved our Core Logging Room to another big room.
We moved our Core Logging Room to another big room. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-07 ˇ
We got few cores, so we didn't scan them today.
We got few cores, so we didn't scan them today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-06 ˇ
We haven't got cores today.
We haven't got cores today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-04 ˇ
It is our vice general engineer Mr Zhangxiaoxi's birthday
It is our vice general engineer, Mr. Zhangxiaoxi's birthday today. We congratulated him and had a joyful supper with him. At seven o'clock, we held a party. A lot of people sang songs and danced to the music. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-03 ˇ
We reached a depth of 1300m at 10:33 this morning.
We reached a depth of 1300m at 10:33 this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-02 ˇ
Deputy Director Wang Da and other officials from CGS
Deputy Director Wang Da and other officials from CGS went back to Beijing this afternoon. The Data Center of CCSD held another training on the making of webpages and Photoshop this afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-01-01 ˇ
Today is the first day of New Year Deputy
Today is the first day of New Year. Deputy Director Wang Da and other officials from CGS inspected CCSD drill site and field labs. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-31 ˇ
Today is the last day of 2001 We got
Today is the last day of 2001. We got more cores and longest hole advance. Mr. Wang Da, the director of CCSD and Deputy Director of China Geological Survery (CGS), and other officials from CGS came Donghai to express regards to all CCSD members. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-30 ˇ
At last, the drillers found the ways to improve core recovery today.
At last, the drillers found the ways to improve core recovery today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-28 ˇ
Both the drilling speed and the Internet connection to
Both the drilling speed and the Internet connection to GFZ are very normal. And the weather in these days is very good. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-27 ˇ
The INTERNET speed to GFZ is normal today. So we can transfer the files from today.
The INTERNET speed to GFZ is normal today. So we can transfer the files from today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-26 ˇ
The scientists are preparing petrophysics tests on the samples from CCSD-PH.
The scientists are preparing petrophysics tests on the samples from CCSD-PH. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-25 ˇ
Today is Christmas Day. We wish every visitors and friends a Merry Christmas and a Happy New Year!
Today is Christmas Day. We wish every visitors and friends a Merry Christmas and a Happy New Year! (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-24 ˇ
We finished logging today. No cores to be scanned.
We finished logging today. No cores to be scanned. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-23 ˇ
The logging work runs smoothly today. The loggers worked very hard.
The logging work runs smoothly today. The loggers worked very hard. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-22 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-21 ˇ
Enginerring are examining the logging Van. We planed to conduct another comprehensive logging...
Enginerring are examining the logging Van. We planed to conduct another comprehensive logging recently (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-20 ˇ
work is going on smoothly
work is going on smoothly (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-19 ˇ
Filament defect happens in Mass Spectrometer in CCSD fluid geochemical lab. The engineers in the...
Filament defect happens in Mass Spectrometer in CCSD fluid geochemical lab. The engineers in the lab are making troubleshooting. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-18 ˇ
Everything was OK today.
Everything was OK today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-17 ˇ
Recently we had few cores. The geologists did not scan the cores today.
Recently we had few cores. The geologists did not scan the cores today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2001-12-16 ˇ
New Year is coming But we still have a
New Year is coming. But we still have a lot of things to do. A pigeon flew into our office, asking us to have a rest.