Daily News
Project Acronym: CCSDP | State: Completed | Expedition ID: 5004
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-15 ˇ
Mr Wang Shouxiang vice minister of Ministry of Land
Mr. Wang Shouxiang, vice minister of Ministry of Land and resources of China and Mr. Zhang Hongtao, vice director of China Geological Survey, lead a delegation of higher officials came here, giving their regards to CCSD members. Madam Xu Zhiqin (PI) and Mr. Zhang Wei (the Chief Engineer) gave them two brief introductions for the new scientific achievements and drilling progress. Accompanied by Mr. Wang Da they paid a visit to drill site and field labs. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-14 ˇ
One minister from Ministry of Land and Resources of
One minister from Ministry of Land and Resources of China will visit CCSD drill site. Everyone is preparing for it. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-13 ˇ
The director Wang Da and the chief engineer Zhang
The director Wang Da and the chief engineer Zhang Wei called on the 70101 drilling team of the third drilling company and gave our greeting of spring festival to all the drillers. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-12 ˇ
All the drill pipes from Germany will be loaded and sent to repair.
All the drill pipes from Germany will be loaded and sent to repair. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-11 ˇ
The chief director of CCSD Wang Da arrived at
The chief director of CCSD, Wang Da arrived at drill site today and he will spend the Spring Festival with us here. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-10 ˇ
The staffs from Donghai branch Company of China Mobile came to visit and held a ball with the...
The staffs from Donghai branch Company of China Mobile came to visit and held a ball with the drillers. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-09 ˇ
Today, Drilling went on well. The thinning agents arrived and will get used soon.
Today, Drilling went on well. The thinning agents arrived and will get used soon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-08 ˇ
The footage of borehole enlarged is 33.19m today. It is much more than before during run24.
The footage of borehole enlarged is 33.19m today. It is much more than before during run24. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-06 ˇ
It took one whole day to redress the borehole.
It took one whole day to redress the borehole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-05 ˇ
Drilling was hindered at the depth of 2117m because
Drilling was hindered at the depth of 2117m because of the new reamer changed. We began to redress the borehole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-04 ˇ
The gel strength value of the mud is too
The gel strength value of the mud is too high and the floating property of the mud is not good enough. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-03 ˇ
Mr. Pan Heping arrived at ccsd drill site and Mr. Zhang Peifeng left today.
Mr. Pan Heping arrived at ccsd drill site and Mr. Zhang Peifeng left today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-02 ˇ
The concentration of nitrogen is abnormal at the depth of 2995m.
The concentration of nitrogen is abnormal at the depth of 2995m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-01-01 ˇ
It is the first day of New Year 2004
It is the first day of New Year 2004 today, happy New Year to everyone who devote to ccsd project. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-31 ˇ
Today is the last day of year 2003. We hold a basketball game to celebrate.
Today is the last day of year 2003. We hold a basketball game to celebrate. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-30 ˇ
Drilling progress of runs 22 went on well and the depth of enlarging borehole will reach 3000m soon.
Drilling progress of runs 22 went on well and the depth of enlarging borehole will reach 3000m soon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-29 ˇ
Everything is ok at drill site today. And the depth of enlarging borehole is 2940.76m.
Everything is ok at drill site today. And the depth of enlarging borehole is 2940.76m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-28 ˇ
Drilling went on well as usual and we got footage of 24.97m today.
Drilling went on well as usual and we got footage of 24.97m today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-27 ˇ
Seven drilling experts left ccsd drill site today and they will go back at December 31.
Seven drilling experts left ccsd drill site today and they will go back at December 31. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-26 ˇ
The drill tools were transported to drill site in the afternoon.
The drill tools were transported to drill site in the afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-25 ˇ
Today is Christmas day. Give best wishes to everybody who joins in the ccsd project.
Today is Christmas day. Give best wishes to everybody who joins in the ccsd project. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-23 ˇ
More than ten guests who are also at work
More than ten guests who are also at work on drilling in the west of china visited ccsd drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-22 ˇ
Today drilling recovered normally and we got footage of 11.63m.
Today drilling recovered normally and we got footage of 11.63m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-21 ˇ
Milling the fish went on today.
Milling the fish went on today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-20 ˇ
New Year is coming; we are going to write some postcards to our friends and relatives.
New Year is coming; we are going to write some postcards to our friends and relatives. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-19 ˇ
Mr. Jia Jun and the chief engineer Zhang Wei arrived at ccsd drill site today.
Mr. Jia Jun and the chief engineer Zhang Wei arrived at ccsd drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-17 ˇ
Mr. Su Dechen, the master of datacenter came to ccsd drill site this morning.
Mr. Su Dechen, the master of datacenter came to ccsd drill site this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-16 ˇ
Today the progress of drilling went on slowly because the tricone bits were stuck by fishes.
Today the progress of drilling went on slowly because the tricone bits were stuck by fishes. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-15 ˇ
We bought a new computer, Legend T400 Work Station from Lianyungang to replace the one on drill...
We bought a new computer, Legend T400 Work Station from Lianyungang to replace the one on drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-14 ˇ
The guide of one tricone bit was drilled a hole by an unidentified object, maybe a fish.
The guide of one tricone bit was drilled a hole by an unidentified object, maybe a fish. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-13 ˇ
Drilling goes on well and the footage is 21.83m today.
Drilling goes on well and the footage is 21.83m today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-12 ˇ
A new microbus was bought and transported to ccsd drill site from Nanjing today.
A new microbus was bought and transported to ccsd drill site from Nanjing today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-11 ˇ
Drilling was hindered at the depth of 2650 m and it took a long time to redress.
Drilling was hindered at the depth of 2650 m and it took a long time to redress. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-10 ˇ
The cones of tricone bit were dull and the footage of enlarging borehole today was 16.8m.
The cones of tricone bit were dull and the footage of enlarging borehole today was 16.8m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-09 ˇ
Madam Zhang Yueqin a member of fluid lab arrived
Madam Zhang Yueqin, a member of fluid lab arrived at drill site this morning. And drilling goes on well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-08 ˇ
Madam Caici left ccsd drill site for Beijing after sampling finished.
Madam Caici left ccsd drill site for Beijing after sampling finished. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-06 ˇ
The guide of one tricone bit dropped off and got lost in the bore hole when enlarging the borehole.
The guide of one tricone bit dropped off and got lost in the bore hole when enlarging the borehole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-05 ˇ
A geological expert from Beijing University reached drill-site for sampling.
A geological expert from Beijing University reached drill-site for sampling. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-04 ˇ
Bit bouncing occurred seven times, it took a long time to move the drilling tools repeatedly.
Bit bouncing occurred seven times, it took a long time to move the drilling tools repeatedly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-03 ˇ
It went on normally that we enlarged the borehole today.
It went on normally that we enlarged the borehole today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-02 ˇ
The glasshouse will be built completed soon.
The glasshouse will be built completed soon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-12-01 ˇ
The depth of the borehole enlarged was 2539.74 m.
The depth of the borehole enlarged was 2539.74 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-30 ˇ
Some geological experts from Beijing arrived at the drill-site for sampling.
Some geological experts from Beijing arrived at the drill-site for sampling. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-29 ˇ
Everything goes well in drill site today.
Everything goes well in drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-28 ˇ
The tricone bit was dull badly, and many teeth dropped off when opening.
The tricone bit was dull badly, and many teeth dropped off when opening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-27 ˇ
The rooms of Finance office and Logging office exchanged today.
The rooms of Finance office and Logging office exchanged today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-26 ˇ
Fireproofing apparatus were bought for fire protection.
Fireproofing apparatus were bought for fire protection. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-25 ˇ
Some tricone bits were carried to drill-site. They would be used at once.
Some tricone bits were carried to drill-site. They would be used at once. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-11-24 ˇ
The temperature of mud rose up and reached more than 50 degrees.
The temperature of mud rose up and reached more than 50 degrees.