Daily News
Project Acronym: CCSDP | State: Completed | Expedition ID: 5004
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-22 ˇ
Madam Xu, who is the chief sceintist of our dilling project, came to the site although she is ill.
Madam Xu, who is the chief sceintist of our dilling project, came to the site although she is ill. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-21 ˇ
We got little penetration in our main hole enlargement today.
We got little penetration in our main hole enlargement today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-20 ˇ
Some geological experts had an excursion to the ultrmafic rock bodies.
Some geological experts had an excursion to the ultrmafic rock bodies. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-19 ˇ
So many visitors came here today.We drilled About 20m.
So many visitors came here today.We drilled About 20m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-18 ˇ
We have widened the drilled hole to a depth of 257.86m today.
We have widened the drilled hole to a depth of 257.86m today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-17 ˇ
A sunny day after several cloudy days.
A sunny day after several cloudy days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-16 ˇ
A computerized remote monitoring system is installed at some divisions.
A computerized remote monitoring system is installed at some divisions. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-15 ˇ
Visitors having visited our drill-site this morning showed much interesting in UHP metamorphic...
Visitors having visited our drill-site this morning showed much interesting in UHP metamorphic miracles. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-14 ˇ
It is rainning all day long
It is rainning all day long (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-13 ˇ
More air bladders occured in the drilling mud of the CCSD hole.
More air bladders occured in the drilling mud of the CCSD hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-12 ˇ
Everything is going on smoothly.
Everything is going on smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-11 ˇ
About two hundred of middle school students visited our drill-site yesterday.
About two hundred of middle school students visited our drill-site yesterday. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-10 ˇ
Some geological experts went to field and took back some rock samples.
Some geological experts went to field and took back some rock samples. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-09 ˇ
Everything is going smoothly.
Everything is going smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-08 ˇ
We listened to a report about geology in this evening.
We listened to a report about geology in this evening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-07 ˇ
We start drilling CCSD Main Hole today.
We start drilling CCSD Main Hole today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-06 ˇ
The experts from Germany left here to Beijing city this morning.
The experts from Germany left here to Beijing city this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-05 ˇ
International cooperating logging is going on smoothly.
International cooperating logging is going on smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-04 ˇ
We continue waiting.
We continue waiting. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-03 ˇ
This morning, some local visitors visited our drill-site.
This morning, some local visitors visited our drill-site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-05-01 ˇ
Today is May Day, some people have a trip to local sight.
Today is May Day, some people have a trip to local sight. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-29 ˇ
Today we examined our body in Lianyungang city.
Today we examined our body in Lianyungang city. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-28 ˇ
The WL-system provided by ICDP was transported to CCSD drill-site today.
The WL-system provided by ICDP was transported to CCSD drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-26 ˇ
The VSP is going on.
The VSP is going on. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-25 ˇ
This afternoon Mr Sun Wensheng the vice minister of
This afternoon, Mr. Sun Wensheng, the vice minister of the ministry of land and resource of China, came here to visit our drill-site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-22 ˇ
The workers of VSP drilled a small hole at the south of CCSD main hole.
The workers of VSP drilled a small hole at the south of CCSD main hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-21 ˇ
This morning, Mr. Conze left here to Beijing city after ending his work.
This morning, Mr. Conze left here to Beijing city after ending his work. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-20 ˇ
Geologists finished the preliminary description core scanning and Gama
Geologists finished the preliminary description, core-scanning and Gama-ray detection this afternoon. New forms of DIS on the integration of different samples have been finished by Ronald. A banquet was held for Ronald's hard work and help. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-19 ˇ
Mr Ronald Conze from ICDP and VSP experts from Changan University have been working very hard these...
Mr Ronald Conze from ICDP and VSP experts from Changan University have been working very hard these days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-18 ˇ
Geophysicists from Changan University are preparing the VSP test.
Geophysicists from Changan University are preparing the VSP test. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-17 ˇ
Today we nearly finished the backup of latest unrolled
Today we nearly finished the backup of latest unrolled core scan image files. Geophysicists from Changan University started to do VSP test. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-16 ˇ
After one night's shower today was very suitable for
After one night's shower, today was very suitable for trip. Some CCSD members at Donghai drillsite took a trip to Lianyungang. The drillers started a short term training today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-15 ˇ
Today we had a heavy thunderstorm We had to
Today we had a heavy thunderstorm. We had to close the whole network at CCSD drill site. The webfiles were generated on the morning of April 16. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-14 ˇ
The update of DIS was nearly finished. Thanks for the good work of ICDP information expert-Ronald...
The update of DIS was nearly finished. Thanks for the good work of ICDP information expert-Ronald Conze. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-13 ˇ
The cores of pilot hole have been scanned almost
The cores of pilot hole have been scanned almost completely. Geologists are trying their best to log the remaining cores. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-11 ˇ
Mr. Conze, the expert of GFZ, came here in the morning.
Mr. Conze, the expert of GFZ, came here in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-10 ˇ
geophisists began to log today.
geophisists began to log today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-09 ˇ
We began to build more house to store more core today.
We began to build more house to store more core today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-08 ˇ
Current depth is 2025m.
Current depth is 2025m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-07 ˇ
We continue to core more 20 meters so that the continuous logging graphs can be ensured.
We continue to core more 20 meters so that the continuous logging graphs can be ensured. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-06 ˇ
At 10 o'clock today we finaly reached the target
At 10 o'clock today, we finaly reached the target depth of pilot hole, 2000m. It's very glad at that moment for all of us. The visitors came from the chinese geoscience university shared our happyness. We held a ""needfire"" party with our visitors in the evening. Laugh and singing filled full the air of our drill-site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-05 ˇ
It's raining all one day. We reached a depth of 1995.12m tonight.
It's raining all one day. We reached a depth of 1995.12m tonight. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-04 ˇ
Madam Xu the PI of CCSD came here this
Madam Xu, the PI of CCSD, came here this afternoon, and held a meeting at once for the next step work. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-03 ˇ
For conveience, we bought another new car and drove it here.
For conveience, we bought another new car and drove it here. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-04-02 ˇ
A research preparative meeting about CCSD was held in Beijing city.
A research preparative meeting about CCSD was held in Beijing city. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-31 ˇ
We recovered about 10m core today. majority of core is eclogite.
We recovered about 10m core today. majority of core is eclogite. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-30 ˇ
A smooth run, we recovered about 16m cores, too.
A smooth run, we recovered about 16m cores, too. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-29 ˇ
The concentration of Carbon Dioxide was higher in the 638 run.
The concentration of Carbon Dioxide was higher in the 638 run. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-28 ˇ
Today we recovered about 15m cores.
Today we recovered about 15m cores.