(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-27 ˇ
This evening, We held a table tennis match with the drilling contractor.
This evening, We held a table tennis match with the drilling contractor. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-26 ˇ
We recovered 7.81m core. Ending at 1895.97m today.
We recovered 7.81m core. Ending at 1895.97m today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-25 ˇ
When approaching the target depth of CCSD pilot hole
When approaching the target depth of CCSD pilot hole, the rate of penetration speeds up. After drilled 13.41m the day before yesterday, drillers drilled 8.05m again yesterday. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-24 ˇ
The 631th coring run is long as 7.44m .
The 631th coring run is long as 7.44m . (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-23 ˇ
Coring is still going along smoothly. Ending the day at 1856.82m.
Coring is still going along smoothly. Ending the day at 1856.82m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-22 ˇ
The depth at 9 pm was 1849.07m.
The depth at 9 pm was 1849.07m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-21 ˇ
CCSD project becomes more and more famous. Three groups of visitos visited our drillsite and labs...
CCSD project becomes more and more famous. Three groups of visitos visited our drillsite and labs today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-20 ˇ
This moring the governor of Jiangsu Province Jiang Yongrong
This moring, the governor of Jiangsu Province, Jiang Yongrong visited our drill-site again. He heard each division's introductions and visited the core-logging lab. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-19 ˇ
The vice minister of CGS Zhang Yanying visited our drill-site today.
The vice minister of CGS Zhang Yanying visited our drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-18 ˇ
In the middle of April the pilot hole of
In the middle of April, the pilot hole of CCSD will reach its final depth. Mr. Wang Da, the director of CCSD and drilling engineers have made a detailed plan for next stage. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-17 ˇ
It is windy today Strong wind has blown all
It is windy today. Strong wind has blown all day. Most of us have to stay in the office. The drillers, however, have kept working at the drillsite. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-16 ˇ
Spring is coming, we are planting some trees to make our drill-site more beautiful.
Spring is coming, we are planting some trees to make our drill-site more beautiful. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-15 ˇ
CCSD borehole extended to 1801m We hope to drill
CCSD borehole extended to 1801m. We hope to drill as quickly as possible, so we can start drilling the main-hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-14 ˇ
Drilling continued smoothly today, ending the day at 1793.79m.
Drilling continued smoothly today, ending the day at 1793.79m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-13 ˇ
Current depth is 1786.20m.
Current depth is 1786.20m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-12 ˇ
We recovered 8.25m of core today.
We recovered 8.25m of core today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-11 ˇ
This afternoon, the head of Donghai county visited our drill-site again.
This afternoon, the head of Donghai county visited our drill-site again. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-10 ˇ
Some visitors came here today.
Some visitors came here today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-09 ˇ
The rock is fragmentized and difficult to be coring
The rock is fragmentized and difficult to be coring. We make great efforts to get the cores. But they should still be put into plastic bags to keep them together. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-08 ˇ
It is the International Working Women's Day here women
It is the International Working Women's Day, here women have a happy holiday. We congratulate every woman all over the world. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-07 ˇ
Everything is normal. Some visitors came here today.
Everything is normal. Some visitors came here today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-06 ˇ
The concentration of hydrogen was higher in the 603 run. We are trying to find out the causes.
The concentration of hydrogen was higher in the 603 run. We are trying to find out the causes. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-05 ˇ
Electric voltage is being abnormal so many days Our
Electric voltage is being abnormal so many days. Our UPS runs at bad condition. We are trying to resolve the problem. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-04 ˇ
All day is raining. Working is going on smoothly.
All day is raining. Working is going on smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-03 ˇ
Everything is normal. But the concentration of hydracid is higher in the 598th coring.
Everything is normal. But the concentration of hydracid is higher in the 598th coring. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-02 ˇ
We reached 1724.20m today. Nearly 13m of core was recovered.
We reached 1724.20m today. Nearly 13m of core was recovered. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-03-01 ˇ
The borehole has been drilled 1712.21m. We expect to finish 2000m coring in April.
The borehole has been drilled 1712.21m. We expect to finish 2000m coring in April. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-28 ˇ
Coring is still proceeding slowly. Current depth is 1703.80m.
Coring is still proceeding slowly. Current depth is 1703.80m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-27 ˇ
We reached a depth of 1694.83m and recovered 8.58m core.
We reached a depth of 1694.83m and recovered 8.58m core. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-26 ˇ
This afternoon, we played a friendly basketball match with the drilling contractor.
This afternoon, we played a friendly basketball match with the drilling contractor. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-25 ˇ
On 25th of February the 22st engineering logging was
On 25th of February, the 22st engineering logging was carried out, which was focused on the footdepth of 1580~1674 m. The results is that the greatest inclination is 3.93 dgrees. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-24 ˇ
We finished the update of our whole CCSD website.
We finished the update of our whole CCSD website. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-23 ˇ
Mr Ni Jialu our vice manager general left drilling
Mr. Ni Jialu, our vice manager general left drilling site and went back to Beijing for being shifted off today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-22 ˇ
The Core Log Lab finished their homepage today. Everyone may see the new information about geology...
The Core Log Lab finished their homepage today. Everyone may see the new information about geology by the website. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-21 ˇ
More and more our colleagues are coming back to
More and more our colleagues are coming back to the dill-site after going home for their Spring Festeval vacation. Our colleagues who continued dilling work during the Festeval will be shifted to go home. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-20 ˇ
This evening, Core Log lab backuped the core pictures that were scaned. These pictures were saved...
This evening, Core Log lab backuped the core pictures that were scaned. These pictures were saved in CD. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-19 ˇ
work is going smoothly
work is going smoothly (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-18 ˇ
On 18th of February the 21st engineering logging was
On 18th of February, the 21st engineering logging was carried out, which was focused on the footdepth of 1550~1626 m. The results is that the greatest inclination is 4.03 dgrees. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-17 ˇ
We reached a depth of 1621.40m at 8 o'clock tonight.
We reached a depth of 1621.40m at 8 o'clock tonight. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-16 ˇ
Everything is normal. We are still immersed in the happyness of festival.
Everything is normal. We are still immersed in the happyness of festival. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-15 ˇ
Today some visitors came here and visited our drillsite
Today some visitors came here and visited our drillsite and Core Log Room. They are the first visitors after Chinese new year. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-14 ˇ
We have succeded in fishing the core bit and reamer lost in the hole.
We have succeded in fishing the core bit and reamer lost in the hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-13 ˇ
We drilled a several satllite boreholes around the nearby
We drilled a several satllite boreholes around the nearby area of CCSDP main hole in previous years to select the drill site of CCSDP main hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-12 ˇ
Today is the first day of the Chinese new
Today is the first day of the Chinese new year. When clockclicked 12 times, we lighted up firecracker to celebrate the new year. In the new year, we must begood luck and get more success. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-11 ˇ
We Chinese are celebrating our lunar new year Spring
We Chinese are celebrating our lunar new year Spring Festival on 12th of February while our driling work is still going on. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-10 ˇ
More and more spouses and offspring of our technicians
More and more spouses and offspring of our technicians and drillers who are assigned to work during the festival are coming to our driling site to celebrate the Spring Festival of Chinese lunar new year. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-09 ˇ
Our Chinese Spring Festival is coming on now We
Our Chinese Spring Festival is coming on now. We are preparing to celebrate the traditional annual event. Some visitors to our drilling site are having a picture taken in front of our drilling base's main gate with red lanterns after their main purpose of vist. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-08 ˇ
Madam Shou Jiahua Vice Minister of Ministry of Land
Madam Shou Jiahua, Vice Minister of Ministry of Land and Resouces and Mr. Wang Da, Director of CCSD continued to visit our field labs. Madam Xu Zhiqin gave the visitors a good introduction. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-07 ˇ
The Chinese New Year is coming Madam Shou Jiahua
The Chinese New Year is coming. Madam Shou Jiahua, Vice Minister of Ministry of Land and Resouces led a group of officials and reporters from Beijing arrived at CCSD drill site this afternoon. They brought their gifts and regards to all CCSD members at drillsite. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-02-06 ˇ
Today was really a busy day A group of
Today was really a busy day. A group of high officials will come here to visit CCSD drill site and field labs tomorrow. We printed a lot of big maps and photos and cleaned all our offices.