Daily News
Project Acronym: CCSDP | State: Completed | Expedition ID: 5004
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-30 ˇ
Continue redressing.
Continue redressing. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-29 ˇ
Everything is going on smoothly.
Everything is going on smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-28 ˇ
It took us one day to redress the borehole from the top to the bottom.
It took us one day to redress the borehole from the top to the bottom. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-27 ˇ
The hole opening has been finished while the depth
The hole-opening has been finished while the depth was 2028m. It took us 111 days from the 7th of May. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-26 ˇ
Working is going on smoothly. Maybe we would finish the enlarging borehole in the evening.
Working is going on smoothly. Maybe we would finish the enlarging borehole in the evening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-25 ˇ
The footage of today is nearly 27m.
The footage of today is nearly 27m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-24 ˇ
Current depth is 1991.51m.
Current depth is 1991.51m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-23 ˇ
The RB130 Top Driver arrived its destination CCSD drill
The RB130 Top Driver arrived its destination, CCSD drill-site, from ICDP. Nearly 40 officials from the Land and Resources Bureau of Jiangsu province came to visit. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-22 ˇ
Some visitors visited the drill-site today.
Some visitors visited the drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-21 ˇ
The footage of today is nearly 25m.
The footage of today is nearly 25m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-20 ˇ
Continue redressing and logging.
Continue redressing and logging. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-19 ˇ
According to the logging data the declination of the
According to the logging data, the declination of the borehole is reduced after several tries to make the borehole straighter. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-18 ˇ
We held a log today again.
We held a log today again. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-17 ˇ
It took us about one day to trip out. We have being continuously redressed for about one week.
It took us about one day to trip out. We have being continuously redressed for about one week. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-16 ˇ
The footage of today is nearly 7m.
The footage of today is nearly 7m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-15 ˇ
The drilling engineers discussed some problems about redressing to get perfect footage.
The drilling engineers discussed some problems about redressing to get perfect footage. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-14 ˇ
A hole-opener is added before tripping in today.
A hole-opener is added before tripping in today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-13 ˇ
Drillers added the hydro-hammer to DHA and try to get straighter borehole and higher ROP.
Drillers added the hydro-hammer to DHA and try to get straighter borehole and higher ROP. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-12 ˇ
We took an electrical log in the morning.
We took an electrical log in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-11 ˇ
Everything is going on smoothly.
Everything is going on smoothly. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-10 ˇ
It took us all one day to redress the bore-hole.
It took us all one day to redress the bore-hole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-09 ˇ
We tripped out when the depth was 1853.35m today.
We tripped out when the depth was 1853.35m today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-08 ˇ
The footage of today is nearly 23m.
The footage of today is nearly 23m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-07 ˇ
Some officials from local government visited the drill-site today.
Some officials from local government visited the drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-06 ˇ
Current depth is 1783.78m. Now we are tripping out.
Current depth is 1783.78m. Now we are tripping out. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-05 ˇ
The computer network at CCSD drill site has been
The computer network at CCSD drill site has been running more than one year. All users are satisfied with the network, especially the INTERNET speed. The databases and other important files at CCSD drill site have been backuped. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-04 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-03 ˇ
We are preparing for the one year anniversary of CCSD openning ceremony.
We are preparing for the one year anniversary of CCSD openning ceremony. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-02 ˇ
Mr Bai Xingbi and Ma Yan from the Ministry
Mr Bai Xingbi and Ma Yan from the Ministry of Land and Mineral Resources of China came to CCSD drill site yesterday evening. They visited CCSD drill site and labs this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-02 ˇ
We found and corrected some errors on the daily report. The footage of today was 31.03m.
We found and corrected some errors on the daily report. The footage of today was 31.03m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-08-01 ˇ
We reached the depth of 1681.77m at 4 am
We reached the depth of 1681.77m at 4 am this morning. The footage of today was 38.74m. A new record of hole advance was created. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-31 ˇ
It has been very hot for several days. The footage of today was normal (29.28m).
It has been very hot for several days. The footage of today was normal (29.28m). (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-30 ˇ
The hole advance from 4 am of yesterday to
The hole advance from 4 am of yesterday to 4 am of today was 1.95m. Compared with normal days, we spent more than ten hours on reaming. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-29 ˇ
The drilling expers are preparing the wireline coring system for the CCSD mainhole. The footage of...
The drilling expers are preparing the wireline coring system for the CCSD mainhole. The footage of today is 26.11m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-28 ˇ
The footage of today is 31.28m
The footage of today is 31.28m (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-27 ˇ
Everything is going on smoothly. The footage of today is about 20m.
Everything is going on smoothly. The footage of today is about 20m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-26 ˇ
It took nearly 23 hours to redressing today Therefore
It took nearly 23 hours to redressing today. Therefore, the drilling engineers will use a special bit to resolve the problem. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-25 ˇ
Current depth is 1520.10m.
Current depth is 1520.10m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-24 ˇ
Serveral women from the ministry of finance visited the drill-site today.
Serveral women from the ministry of finance visited the drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-23 ˇ
Some experts from Russia arriveed at the drill-site and began trialling their drilling MWD today.
Some experts from Russia arriveed at the drill-site and began trialling their drilling MWD today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-22 ˇ
Nearly 35m footage was finished today.
Nearly 35m footage was finished today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-21 ˇ
We tripped out and changed a bit today.
We tripped out and changed a bit today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-20 ˇ
It's raining all one day. We are delight with it for the cool took by the rain.
It's raining all one day. We are delight with it for the cool took by the rain. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-19 ˇ
Hundreds of schoolmasters from Shanghai city visited our drill-site today.
Hundreds of schoolmasters from Shanghai city visited our drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-18 ˇ
We created a new record as nearly 39m footage of today.
We created a new record as nearly 39m footage of today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-17 ˇ
The basketball match was held this afternoon between the
The basketball match was held this afternoon between the sixth geological exploration team which is lacal seolosical survey unit and the site headquarter of CCSD. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-16 ˇ
We created a new record as nearly 37m footage of today.
We created a new record as nearly 37m footage of today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-15 ˇ
The symposium on the preliminary development of CCSD and
The symposium on the preliminary development of CCSD and UHP was held since July 12 to July 14. Nearly 60 Chinese scientists attended this meeting. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-14 ˇ
The rig crew took a fire-cotrol excercise today.
The rig crew took a fire-cotrol excercise today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2002-07-13 ˇ
The air temperature is especially high today.
The air temperature is especially high today.