Daily News
Project Acronym: CCSDP | State: Completed | Expedition ID: 5004
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-27 ˇ
The floormen have been working hard Although it is
The floormen have been working hard. Although it is dead hot these days so that the drilling work goes on very well. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-26 ˇ
Core drilling goes on slowly; it is the reason that we get some intact pieces of core these days.
Core drilling goes on slowly; it is the reason that we get some intact pieces of core these days. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-25 ˇ
Mr. Jia Jun, Mr. Zhang Peifeng and Mr. Zhang Xiaoxi returned to CCSD drill site today.
Mr. Jia Jun, Mr. Zhang Peifeng and Mr. Zhang Xiaoxi returned to CCSD drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-24 ˇ
We will get some pieces of core as biologic sample at this depth.
We will get some pieces of core as biologic sample at this depth. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-23 ˇ
Mr. Zhan Xiuchun arrived at drill site today.
Mr. Zhan Xiuchun arrived at drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-23 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-22 ˇ
A medical student comes to drill site today She
A medical student comes to drill site today. She supplies us with physical therapy with an electrical apparatus, and all is free. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-21 ˇ
Logging was completed, according to the logging result; the average inclination angle is 18.47...
Logging was completed, according to the logging result; the average inclination angle is 18.47 degrees (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-20 ˇ
Drilling went on well today and we got 9.10m footage.
Drilling went on well today and we got 9.10m footage. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-19 ˇ
The logging engineers arrived at CCSD drill site today. They will log the borehole MH-2C tomorrow...
The logging engineers arrived at CCSD drill site today. They will log the borehole MH-2C tomorrow morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-18 ˇ
Some guests from local area visited the geological museum. Dr. Chen made a chief introduction for...
Some guests from local area visited the geological museum. Dr. Chen made a chief introduction for the visitors. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-17 ˇ
Some students with their teachers who come from the
Some students with their teachers who come from the Anfeng center primary school arrive at CCSD drill-site and visit the geological museum. It is a good chance for them to learn about the scientific knowledge. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-16 ˇ
Drilling goes on well today.
Drilling goes on well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-15 ˇ
Drilling went on well except some sticking at the depth of 4015m.
Drilling went on well except some sticking at the depth of 4015m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-14 ˇ
The engineers are logging the cores in core log lab.
The engineers are logging the cores in core log lab. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-13 ˇ
The workers began to dismantle the experimental borehole PP4 today.
The workers began to dismantle the experimental borehole PP4 today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-12 ˇ
Madam Han Heping an official from financial department of
Madam Han Heping, an official from financial department of the Ministry of Land and Resources PRC, arrived at drill-site and had a visit yesterday. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-11 ˇ
The depth of well MH 2C reached 4000m in
The depth of well MH-2C reached 4000m in the morning today. We celebrated with a rich dinner together in the evening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-10 ˇ
Several tans of diesel oil were transported to the
Several tans of diesel oil were transported to the drill site by a tank car in the afternoon for generator supplies. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-09 ˇ
The depth of well MH-2C will reach 4000m soon.
The depth of well MH-2C will reach 4000m soon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-08 ˇ
An engineer arrived at drill site in the morning. He examined and fixed the core total gamma-ray...
An engineer arrived at drill site in the morning. He examined and fixed the core total gamma-ray logger. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-07 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-06 ˇ
The workers began to repair the geological museum and built a pavilion near the museum.
The workers began to repair the geological museum and built a pavilion near the museum. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-05 ˇ
We got many pieces of core in the morning, about 9.5m long.
We got many pieces of core in the morning, about 9.5m long. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-04 ˇ
The core total gamma ray logger works unusual these
The core total gamma-ray logger works unusual these days. Maybe there is something wrong with the sensor of logger. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-03 ˇ
Core drilling of MH-2C goes on well today.
Core drilling of MH-2C goes on well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-02 ˇ
Lots of visitors from tianjin came to drill site
Lots of visitors from tianjin came to drill site and visited the geological museum. Mr. Zou Yongxing made a brief introduction to them. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-07-01 ˇ
The logging engineers began to log well after supper.
The logging engineers began to log well after supper. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-30 ˇ
Drilling goes on well today Some logging engineers come
Drilling goes on well today. Some logging engineers come to CCSD drill site and they will log well MH-2C tomorrow. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-29 ˇ
We got much more footage 9.30m and drilling goes on well today.
We got much more footage 9.30m and drilling goes on well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-28 ˇ
The vice director Ni Jialu and his wife left CCSD drill site today.
The vice director Ni Jialu and his wife left CCSD drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-27 ˇ
There was something wrong with the LAN in the
There was something wrong with the LAN in the Fluid Lab. it took us several hours to check and solve. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-26 ˇ
A heavy rain with lightings came in the evening
A heavy rain with lightings came in the evening. We had to cut off the connection between Internet and the LAN. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-25 ˇ
Drilling tools was stuck by a fish.
Drilling tools was stuck by a fish. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-24 ˇ
The concentration of methane rose up today.
The concentration of methane rose up today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-23 ˇ
The footage of today is 9.3m, the core recovery is very high.
The footage of today is 9.3m, the core recovery is very high. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-22 ˇ
Today is dragon boat festival; we had a taste of rice dumpling in the morning.
Today is dragon boat festival; we had a taste of rice dumpling in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-21 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-20 ˇ
Logging was completed, according to the logging result ,the inclination angle is 11.7 degrees.
Logging was completed, according to the logging result ,the inclination angle is 11.7 degrees. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-19 ˇ
The new drilling jar was carried to CCSD drill site.
The new drilling jar was carried to CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-18 ˇ
The core scanner can't work normally today.
The core scanner can't work normally today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-17 ˇ
The new logging winch was carried to CCSD drill site to replace the old one.
The new logging winch was carried to CCSD drill site to replace the old one. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-16 ˇ
The depth of coring borehole is 3846.00m.
The depth of coring borehole is 3846.00m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-15 ˇ
We were looked over body healthy by the doctor today.
We were looked over body healthy by the doctor today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-14 ˇ
We have reached the depth of 3842.46m. No cores were gotten.
We have reached the depth of 3842.46m. No cores were gotten. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-13 ˇ
The vice chief engineer Zhang Xiaoxi puts forward the temperature of mud question at the meeting of...
The vice chief engineer Zhang Xiaoxi puts forward the temperature of mud question at the meeting of today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-12 ˇ
Three graduate students from China University of Geology arrived at CCSD drill site in the morning.
Three graduate students from China University of Geology arrived at CCSD drill site in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-11 ˇ
Mr. Li Yingchun and Madam Xu Jue left CCSD drill site.
Mr. Li Yingchun and Madam Xu Jue left CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-10 ˇ
A basketball match was held between 70101 drilling team with us in the afternoon.
A basketball match was held between 70101 drilling team with us in the afternoon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-06-09 ˇ
Some guests form Jiangsu province Commission of Population and Family Planning visited CCSD drill...
Some guests form Jiangsu province Commission of Population and Family Planning visited CCSD drill site.