(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-10 ˇ
Nine practice students from Wuhan Geology University came to CCSD. They will stay here for three...
Nine practice students from Wuhan Geology University came to CCSD. They will stay here for three weeks. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-09 ˇ
Hundreds of new drilling pipes from Shanghai arrived at noon.
Hundreds of new drilling pipes from Shanghai arrived at noon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-08 ˇ
Many local students from a normal school paid a visit to CCSD drill site this morning.
Many local students from a normal school paid a visit to CCSD drill site this morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-07 ˇ
Mr. Wang Da the director of CCSD project came back.
Mr. Wang Da the director of CCSD project came back. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-06 ˇ
A heavy rain with lightings came in the evening
A heavy rain with lightings came in the evening. We had to cut off the connection between Internet and the LAN. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-05 ˇ
Some officials from Ministry of Land and Resources arrived
Some officials from Ministry of Land and Resources arrived at CCSD drill site. Mrs. Cai ci made a brief introduction to them. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-04 ˇ
Today is the 2 years anniversary of CCSD opening ceremony.
Today is the 2 years anniversary of CCSD opening ceremony. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-03 ˇ
Mr.Su Dechen, the manager of Data Center left for Beijing.
Mr.Su Dechen, the manager of Data Center left for Beijing. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-02 ˇ
We went to Lianyungang and bought some new Logitech mice.
We went to Lianyungang and bought some new Logitech mice. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-08-01 ˇ
Today, we got two pieces of cores which were longer than others.
Today, we got two pieces of cores which were longer than others. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-31 ˇ
We held a basketball match today and lost it.
We held a basketball match today and lost it. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-30 ˇ
An engineer of IBM reached the Data Center of CCSD to examine a server which was damaged last week.
An engineer of IBM reached the Data Center of CCSD to examine a server which was damaged last week. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-29 ˇ
A special guest arrived at DongHai and visited CCSD
A special guest arrived at DongHai and visited CCSD at afternoon. He wants to travel all over the countries of China in his ten years. At every country, he collects the local soil to draw a China map. At last he took some photos and inquired about CCSD. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-28 ˇ
We could visit the internet as usual.
We could visit the internet as usual. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-27 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-26 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-25 ˇ
Logging was completed, according to the logging result, the average inclination angle is 12 degrees.
Logging was completed, according to the logging result, the average inclination angle is 12 degrees. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-24 ˇ
We did another logging this afternoon The result would
We did another logging this afternoon. The result would be published tomorrow. In addition, the methane and the carbon dioxide continue keeping high concentration. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-23 ˇ
The methane and the carbon dioxide continue keeping high concentration.
The methane and the carbon dioxide continue keeping high concentration. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-22 ˇ
Correcting the borehole trajectory finished .We got some new cores.
Correcting the borehole trajectory finished .We got some new cores. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-21 ˇ
The concentration of Methane reached about 5000 ppm that is very high.
The concentration of Methane reached about 5000 ppm that is very high. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-20 ˇ
Some natives paid a visit to our drill-site today.
Some natives paid a visit to our drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-19 ˇ
The hole advance of directional drilling is 7.09m.We are preparing for reaming .
The hole advance of directional drilling is 7.09m.We are preparing for reaming . (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-18 ˇ
The inclination angle increased very rapidly, so it is necessary to correct the borehole...
The inclination angle increased very rapidly, so it is necessary to correct the borehole tracjectory again. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-17 ˇ
Today ,more cores were taken out than before.
Today ,more cores were taken out than before. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-16 ˇ
According to the logging result the angle of the
According to the logging result ,the angle of the inclination hole reached about 10 degrees .Therefore the drilling experts decided to correct the borehole trajectory. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-15 ˇ
Logging is still going on in the rain, which will be ended tomorrow morning.
Logging is still going on in the rain, which will be ended tomorrow morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-15 ˇ
In addition,the engineers took out some new cores at noon.
In addition,the engineers took out some new cores at noon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-14 ˇ
Some logging engineers come to drill site today, and they are going to log well tomorrow.
Some logging engineers come to drill site today, and they are going to log well tomorrow. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-13 ˇ
A new graduate named Yang Zhenkun came to datacenter. Two logging experts came back from Beijing.
A new graduate named Yang Zhenkun came to datacenter. Two logging experts came back from Beijing. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-12 ˇ
The footage of today is nearly 10m. It took a long time to trip out.
The footage of today is nearly 10m. It took a long time to trip out. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-11 ˇ
CCSD Scientific Meeting 2003 was held on July 10
CCSD Scientific Meeting 2003 was held on July 10 to 11 in Beijing. Nearly 60 Chinese geological scientists attended this meeting. Madam Xu Zhiqin, the PI, and twenty more other geologists gave their oral presentations at this meeting. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-10 ˇ
Nearly 30 officials from Jiangsu Oilfield visited drill-site today.
Nearly 30 officials from Jiangsu Oilfield visited drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-09 ˇ
Current depth is 3171.28m.
Current depth is 3171.28m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-08 ˇ
Some experts left for Beijing to attend a meeting about geology.
Some experts left for Beijing to attend a meeting about geology. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-07 ˇ
A malfunction of the new steering tool was obviated.
A malfunction of the new steering tool was obviated. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-06 ˇ
Some guests from local ensure public security department visited drill-site today.
Some guests from local ensure public security department visited drill-site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-05 ˇ
No any gases were abnormal today. Some cores were gotten.
No any gases were abnormal today. Some cores were gotten. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-04 ˇ
A meeting about well name and drilling runs was held.
A meeting about well name and drilling runs was held. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-03 ˇ
The methane, the helium, and the carbon dioxide keep still high concentration.
The methane, the helium, and the carbon dioxide keep still high concentration. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-02 ˇ
All the drilling engineers had a meeting to discuss how to sidetrack well today.
All the drilling engineers had a meeting to discuss how to sidetrack well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-07-01 ˇ
We have reached the depth of 3135.85m. No cores were gotten.
We have reached the depth of 3135.85m. No cores were gotten. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-30 ˇ
Some geological experts arrived at drill-site to collect geologic information for a meeting.
Some geological experts arrived at drill-site to collect geologic information for a meeting. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-29 ˇ
The log device bought from Hebei province was used
The log device bought from Hebei province was used today for the first time. It took us all night long to coil the new tight-wire. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-28 ˇ
A meeting about the inclination angle of the hole was held. We decided to sidetrack at once.
A meeting about the inclination angle of the hole was held. We decided to sidetrack at once. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-27 ˇ
Current depth is 3125m. Nearly 10m cores were scaned.
Current depth is 3125m. Nearly 10m cores were scaned. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-26 ˇ
The chief engineer Zhang Wei was elected the Excellent Chinese Communist.
The chief engineer Zhang Wei was elected the Excellent Chinese Communist. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-25 ˇ
The footage of today is nearly 10m, however, the core recovery is very low.
The footage of today is nearly 10m, however, the core recovery is very low. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-24 ˇ
After finishing the evaluation, the drilling expert group left for Beijing by air.
After finishing the evaluation, the drilling expert group left for Beijing by air. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2003-06-23 ˇ
The drilling expert group visited Core Log Lab and drill rig.
The drilling expert group visited Core Log Lab and drill rig.