Daily News
Project Acronym: CCSDP | State: Completed | Expedition ID: 5004
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-26 ˇ
Some logging engineers came to CCSD drill site today.
Some logging engineers came to CCSD drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-25 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-24 ˇ
Today the progress of drilling went on slowly because the hydro hammer can't work normally.
Today the progress of drilling went on slowly because the hydro hammer can't work normally. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-23 ˇ
Some guests from the Bureau of land resources Tianjin visited the CCSD drill site.
Some guests from the Bureau of land resources Tianjin visited the CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-22 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-21 ˇ
Today, we got a piece of cores which was longer than others. It is 4.25m long.
Today, we got a piece of cores which was longer than others. It is 4.25m long. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-20 ˇ
The new drilling jar was carried to CCSD drill site.
The new drilling jar was carried to CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-19 ˇ
We ran the training class of CCSD item files administration today.
We ran the training class of CCSD item files administration today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-18 ˇ
Three file clerks have came arrived at CCSD drill site in the morning.
Three file clerks have came arrived at CCSD drill site in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-17 ˇ
We cleaned the fan of the diesel engine today.
We cleaned the fan of the diesel engine today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-16 ˇ
Congratulaions that we had a good dinner at the weekend.
Congratulaions that we had a good dinner at the weekend. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-15 ˇ
We got much more footage 9.30m and drilling goes on well today.
We got much more footage 9.30m and drilling goes on well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-14 ˇ
According the electrical logging result, the inclination angle of borehole reached 23 degrees.
According the electrical logging result, the inclination angle of borehole reached 23 degrees. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-13 ˇ
The depth of well MH-2C reached 4600m in the morning today.
The depth of well MH-2C reached 4600m in the morning today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-12 ˇ
A British expert coming along with Dr. Chen Shizhong arrived.
A British expert coming along with Dr. Chen Shizhong arrived. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-11 ˇ
The workers are installing the drill collar.
The workers are installing the drill collar. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-10 ˇ
Drilling goes on well and we get 8.73m footage.
Drilling goes on well and we get 8.73m footage. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-09 ˇ
The Chief engineer Zhang Wei return to CCSD drill site today.
The Chief engineer Zhang Wei return to CCSD drill site today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-08 ˇ
The drillers are cleaning the dust on the drilling mast.
The drillers are cleaning the dust on the drilling mast. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-07 ˇ
We find some short number of cell-phone is inexistence.
We find some short number of cell-phone is inexistence. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-06 ˇ
Tripping in was hindered at the depth of 4551 m.
Tripping in was hindered at the depth of 4551 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-05 ˇ
Coring 4542.23m to 4551.33m.
Coring 4542.23m to 4551.33m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-04 ˇ
The bottom-drive drill motors were transported to drill site.
The bottom-drive drill motors were transported to drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-03 ˇ
Some guests came to CCSD drill site and visited the geological museum and drill site.
Some guests came to CCSD drill site and visited the geological museum and drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-02 ˇ
We fired the fireworks to celebrate the National Day.
We fired the fireworks to celebrate the National Day. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-10-01 ˇ
Today is Zhang Peifeng's birthday, we celebrate for him.
Today is Zhang Peifeng's birthday, we celebrate for him. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-30 ˇ
We will have a dinner together to celebrate the National Day this evening.
We will have a dinner together to celebrate the National Day this evening. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-29 ˇ
We have bought lots of fireworks and prepare for celebrate the National day!
We have bought lots of fireworks and prepare for celebrate the National day! (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-28 ˇ
Binary file (standard input) matches
Binary file (standard input) matches (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-27 ˇ
Today the depth of MH 2C reached and exceed
Today, the depth of MH-2C reached and exceed 4500m in the morning. And the logging engineers will arrive tomorrow to log the borehole. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-26 ˇ
We found some crystal in the interstices of the core at this run.
We found some crystal in the interstices of the core at this run. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-25 ˇ
Chinese traditional festival Mid Autumn Day is coming the
Chinese traditional festival, Mid Autumn Day is coming; the 70101 team and local telecom officials gave their gifts and flowers to us today. They whished we have a nice Mid Autumn Day. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-24 ˇ
Some reporters from the Xinhua News Agency visited the
Some reporters from the Xinhua News Agency visited the CCSD drill site and collected some information of the CCSD project. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-23 ˇ
The project centre gives us the moon cake per office today.
The project centre gives us the moon cake per office today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-22 ˇ
These practice students ended their practice and left here for Wuhan in the afternoon. Have a good...
These practice students ended their practice and left here for Wuhan in the afternoon. Have a good trip. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-21 ˇ
These practice students who came from China University of Geology (Wuhan) take a picture in CCSD...
These practice students who came from China University of Geology (Wuhan) take a picture in CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-20 ˇ
Drilling goes on well today.
Drilling goes on well today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-19 ˇ
We will get some pieces of core as microbe sample at this runs.
We will get some pieces of core as microbe sample at this runs. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-18 ˇ
Drilling goes on well today and we got 9.15m footage.
Drilling goes on well today and we got 9.15m footage. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-17 ˇ
The concentrations of methane continue keeping high today.
The concentrations of methane continue keeping high today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-16 ˇ
Three foreign visitors from Italy visited the geological museum and drill site.
Three foreign visitors from Italy visited the geological museum and drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-15 ˇ
Drilling was hindered at the depth of 4405m and it took a long time to redress.
Drilling was hindered at the depth of 4405m and it took a long time to redress. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-14 ˇ
Director Wang Da left drill site for Beijing in the morning.
Director Wang Da left drill site for Beijing in the morning. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-13 ˇ
Hydrogen gas rose in concentration today.
Hydrogen gas rose in concentration today. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-12 ˇ
Logging has ended; we began coring in the noon.
Logging has ended; we began coring in the noon. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-11 ˇ
We used photographic aviation to take aerial photography at the CCSD drill site.
We used photographic aviation to take aerial photography at the CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-10 ˇ
Logging was hindered at the depth of 3690 m.
Logging was hindered at the depth of 3690 m. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-09 ˇ
Four guests from Hebei geological prospecting bureau No.5 party visited the geological museum and...
Four guests from Hebei geological prospecting bureau No.5 party visited the geological museum and the CCSD drill-site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-08 ˇ
Guo liming,the member of datacenter came to CCSD drill site.
Guo liming,the member of datacenter came to CCSD drill site. (inserted: 30.09.2022 17:41)CCSDP/Donghai: 2004-09-07 ˇ
Some logging engineers came to CCSD drill site today.
Some logging engineers came to CCSD drill site today.