Daily News
Project Acronym: HSDP | State: Completed | Expedition ID: 5027
ins.: 2004-11-05 01:00, 21 yrs ago

Category:
Hawaii_

hawaii: 2004-11-05
Today pipe was tripped in all the way to the ...

Today pipe was tripped in all the way to the bottom of the casing, ~9,800 feet. The hole was then flushed of old mud, and new drilling mud was pumped in for drilling lubrication. However, fluid pressures in the hole are very high (600-700 psi), and chief engineer Bruce Howell will apply a variety of techniques to reduce this pressure before drilling through the casing shoe.
