Skip to main content

Daily News

Project Acronym: HSDP | State: Completed | Expedition ID: 5027

ins.: 2004-11-25 01:00, 21 yrs ago
By: Scientists
Category: Hawaii_
Hawaii_

hawaii: 2004-11-25

We had a productive Thanksgiving today at the site. Engineer ...
https://www.icdp-online.org/fileadmin/icdp/projects/data//hsdp//2004_11_25/IOD_DESC.txt

We had a productive Thanksgiving today at the site. Engineer Bruce Howell arrived in the morning with a brand new mill bit and 30 feet of super stiff pipe. The drillers attached these tools to the existing drill pipe and tripped to the bottom of the hole. Tomorrow morning we hope to drill through the side wall of the bent casing, and establish a straighter hole for coring operations.