... (?TBD)
(inserted: 14.08.1999 02:00)hawaii: 1999-08-14 ˇ
We saw 80' of aphyric pillow basalts today. Drillers just
We saw 80' of aphyric pillow basalts today. Drillers just began tripping for a bit change. (inserted: 13.08.1999 02:00)hawaii: 1999-08-13 ˇ
We've recovered 69.5 feet of sparsely to moderately vesicular, sparsely ...
We've recovered 69.5 feet of sparsely to moderately vesicular, sparsely olivine-phyric pillow basalts. Current depth of hole is 7914 feet. (inserted: 12.08.1999 02:00)hawaii: 1999-08-12 ˇ
We had another 75' of aphyric pillow basalt today. Ending
We had another 75' of aphyric pillow basalt today. Ending depth is 7835'. (inserted: 11.08.1999 02:00)hawaii: 1999-08-11 ˇ
Drillers tripped out last night to replace a worn out
Drillers tripped out last night to replace a worn out bit. Tomorrow we should see another batch of core! (inserted: 10.08.1999 02:00)hawaii: 1999-08-10 ˇ
We recovered 26' of aphyric pillow basalt this morning; depth
We recovered 26' of aphyric pillow basalt this morning; depth now 7713'. (inserted: 09.08.1999 02:00)hawaii: 1999-08-09 ˇ
We recovered 100' of core; much of it was a
We recovered 100' of core; much of it was a massive basalt with a fine-grained matrix. (inserted: 08.08.1999 02:00)hawaii: 1999-08-08 ˇ
Drillers had to trip out last night to replace the ...
Drillers had to trip out last night to replace the core barrel shoe; we recovered 11' of pillow basalt today. (inserted: 07.08.1999 02:00)hawaii: 1999-08-07 ˇ
We cored to 7576' today recovering aphyric pillow basalt.
We cored to 7576' today recovering aphyric pillow basalt. (inserted: 06.08.1999 02:00)hawaii: 1999-08-06 ˇ
Drillers tripped out to change the bit. Recovered 32.9 feet
Drillers tripped out to change the bit. Recovered 32.9 feet of core consisting of aphyric pillow basalts. (inserted: 05.08.1999 02:00)hawaii: 1999-08-05 ˇ
Today we say farewell to Mike the tool pusher. We've
Today we say farewell to Mike the tool pusher. We've also recovered 70 feet of core today. (inserted: 04.08.1999 02:00)hawaii: 1999-08-04 ˇ
We recovered 115' of hyaloclastite and pillow basalt for a
We recovered 115' of hyaloclastite and pillow basalt for a final depth of 7404'. (inserted: 03.08.1999 02:00)hawaii: 1999-08-03 ˇ
We recovered 100' of core today and still cruising!
We recovered 100' of core today and still cruising! (inserted: 02.08.1999 02:00)hawaii: 1999-08-02 ˇ
We're back in the hyaloclastite; 105' recovered today.
We're back in the hyaloclastite; 105' recovered today. (inserted: 01.08.1999 02:00)hawaii: 1999-08-01 ˇ
We recovered core to 7081' before stopping to change the
We recovered core to 7081' before stopping to change the drill bit. (inserted: 31.07.1999 02:00)hawaii: 1999-07-31 ˇ
Drillers recovered 93' feet of core today.
Drillers recovered 93' feet of core today. (inserted: 30.07.1999 02:00)hawaii: 1999-07-30 ˇ
Drillers changed the drill bit last night. We saw about
Drillers changed the drill bit last night. We saw about 50' of hyaloclastite and pillow basalt today. (inserted: 29.07.1999 02:00)hawaii: 1999-07-29 ˇ
85' of massive basalt was recovered today; we have now
85' of massive basalt was recovered today; we have now reached a depth of 6875'. (inserted: 28.07.1999 02:00)hawaii: 1999-07-28 ˇ
We recovered ~95' of core today; most of it was
We recovered ~95' of core today; most of it was massive basalt. (inserted: 27.07.1999 02:00)hawaii: 1999-07-27 ˇ
Recovered 100' today for a depth of ~6700'.
Recovered 100' today for a depth of ~6700'. (inserted: 26.07.1999 02:00)hawaii: 1999-07-26 ˇ
At 6580', we began recovering moderately olivine-phyric pillow basalt.
At 6580', we began recovering moderately olivine-phyric pillow basalt. (inserted: 25.07.1999 02:00)hawaii: 1999-07-25 ˇ
Drillers stopped overnight to change a bit; they still recovered
Drillers stopped overnight to change a bit; they still recovered 45' of core today. (inserted: 24.07.1999 02:00)hawaii: 1999-07-24 ˇ
We recovered 120' of hyaloclastite today.
We recovered 120' of hyaloclastite today. (inserted: 23.07.1999 02:00)hawaii: 1999-07-23 ˇ
We recovered 130' for a total depth of 6388'.
We recovered 130' for a total depth of 6388'. (inserted: 22.07.1999 02:00)hawaii: 1999-07-22 ˇ
We had 116' of core today-- hyaloclastite and a massive
We had 116' of core today-- hyaloclastite and a massive basalt (inserted: 21.07.1999 02:00)hawaii: 1999-07-21 ˇ
We recovered nearly 100' of core today.
We recovered nearly 100' of core today. (inserted: 20.07.1999 02:00)hawaii: 1999-07-20 ˇ
Coring again! We reached 6040' today.
Coring again! We reached 6040' today. (inserted: 19.07.1999 02:00)hawaii: 1999-07-19 ˇ
After correcting minor problems with the 5" liner, drillers tripped ...
After correcting minor problems with the 5" liner, drillers tripped in the liner and drill string and began drilling again today; we hope to see core tomorrow. (inserted: 18.07.1999 02:00)hawaii: 1999-07-18 ˇ
Today, drillers pulled and inspected the 5" liner.
Today, drillers pulled and inspected the 5" liner. (inserted: 17.07.1999 02:00)hawaii: 1999-07-17 ˇ
Drillers laid down the top drive in order to pull
Drillers laid down the top drive in order to pull the 5" liner for inspection. (inserted: 16.07.1999 02:00)hawaii: 1999-07-16 ˇ
Drillers have discovered a problem with the liner; they are
Drillers have discovered a problem with the liner; they are working to resolve this problem. (inserted: 15.07.1999 02:00)hawaii: 1999-07-15 ˇ
We are expecting core again by late today.
We are expecting core again by late today. (inserted: 14.07.1999 02:00)hawaii: 1999-07-14 ˇ
Drillers continue preparations for coring.
Drillers continue preparations for coring. (inserted: 13.07.1999 02:00)hawaii: 1999-07-13 ˇ
Drillers have finished drilling through cement and are pulling out ...
Drillers have finished drilling through cement and are pulling out the reaming drill string in preparation for coring. We hope for core late tomorrow. (inserted: 12.07.1999 02:00)hawaii: 1999-07-12 ˇ
Drilling through the cement continues; we look forward to new
Drilling through the cement continues; we look forward to new core soon. (inserted: 11.07.1999 02:00)hawaii: 1999-07-11 ˇ
Drillers have begun drilling through the cement used for setting
Drillers have begun drilling through the cement used for setting casing. (inserted: 10.07.1999 02:00)hawaii: 1999-07-10 ˇ
Despite minor setbacks, drillers continue to work hard on casing;
Despite minor setbacks, drillers continue to work hard on casing; core expected on Tuesday. (inserted: 09.07.1999 02:00)hawaii: 1999-07-09 ˇ
The geology crew takes a well-deserved day off while waiting ...
The geology crew takes a well-deserved day off while waiting for new core; coring is expected to resume on Sunday. (inserted: 08.07.1999 02:00)hawaii: 1999-07-08 ˇ
The geology crew spent the day reconditioning old archive boxes ...
The geology crew spent the day reconditioning old archive boxes into working boxes. We are expecting core again sometime on Saturday. (inserted: 07.07.1999 02:00)hawaii: 1999-07-07 ˇ
While drillers set casing, the geology crew has been getting
While drillers set casing, the geology crew has been getting ready for core. Two days and counting! (inserted: 06.07.1999 02:00)hawaii: 1999-07-06 ˇ
Drillers continue to work on setting casing; geologists finally finished
Drillers continue to work on setting casing; geologists finally finished archive core! (inserted: 05.07.1999 02:00)hawaii: 1999-07-05 ˇ
Logging was completed today; drillers are now beginning preparations for
Logging was completed today; drillers are now beginning preparations for setting casing to 6000'. (inserted: 04.07.1999 02:00)hawaii: 1999-07-04 ˇ
Today we celebrated the Fourth of July as well logging
Today we celebrated the Fourth of July as well logging continued. (inserted: 03.07.1999 02:00)hawaii: 1999-07-03 ˇ
Logging of the well hole continues; 2 televiewer logs and
Logging of the well hole continues; 2 televiewer logs and a resistivity log were completed today. (inserted: 02.07.1999 02:00)hawaii: 1999-07-02 ˇ
The geology crew has been working hard to finish processing ...
The geology crew has been working hard to finish processing the first 6000 feet of core. Only a few more pallets of archive core need to be prepared before we are ready for more core! (inserted: 01.07.1999 02:00)hawaii: 1999-07-01 ˇ
Drillers expect to be finished reaming at around midnight tonight. ...
Drillers expect to be finished reaming at around midnight tonight. The geology crew is preparing archive core to be palletized and shipped. (inserted: 30.06.1999 02:00)hawaii: 1999-06-30 ˇ
Drillers expect to finish reaming by tomorrow night. Well loggers
Drillers expect to finish reaming by tomorrow night. Well loggers continue to test instruments and prepare for logging. (inserted: 29.06.1999 02:00)hawaii: 1999-06-29 ˇ
Reaming continues; drillers expect 5800' by midnight.
Reaming continues; drillers expect 5800' by midnight. (inserted: 28.06.1999 02:00)hawaii: 1999-06-28 ˇ
Reaming continues smoothly after the bit change; current depth about
Reaming continues smoothly after the bit change; current depth about 5550'. (inserted: 27.06.1999 02:00)hawaii: 1999-06-27 ˇ
Drillers reamed to 5489' then stopped to change the bit.
Drillers reamed to 5489' then stopped to change the bit. (inserted: 26.06.1999 02:00)hawaii: 1999-06-26 ˇ
Reaming continues slowly; the geology crew has begun preparing core
Reaming continues slowly; the geology crew has begun preparing core for archive.