PetenItza

Petén Itzá: 2006-02-14
Progress at the second site (Pi-1) has been swift.

Progress at the second site (Pi-1) has been swift. With the drilling techniques optimized, recovery at the second hole (B) was excellent (94%.) The logging team from the ICDP is expected to log the B hole during the night shift. Cores have been streaming into the reefer.