Daily News
Project Acronym: IDDP-2 | State: Completed | Expedition ID: 5029
ins.: 2016-09-23 02:00, 9 yrs ago

Category:
IDDP-2

IDDP: 2016-09-23
Drilling continued in the morning of September 23rd, and the ...

Drilling continued in the morning of September 23rd, and the cement float collar was drilled at the depth of 2937 m at 0630 hrs with WOB between 0 and 2 tons. No losses were measured at that time. At 0800 hrs, losses were about 13 l/s, the cement is rather soft. Losses measured 18 l/s at 0955 hrs. Drill bit depth is 3000 m at 1100 hrs. Drilling has stopped at 3002.4 m to run gyro survey.
- Links:
- /fileadmin/icdp/projects/data/iddp/2016_09_23/DIS_OTHER.htm