Project Acronym: IDDP-2 | State: Completed | Expedition ID: 5029
ins.: 2016-09-25 02:00, 9 yrs ago

Category:
IDDP-2

IDDP: 2016-09-25
On September 24th, drilling was ongoing for most of the ...

On September 24th, drilling was ongoing for most of the day, through the cement plug and into formation from 3040 (mix with cement) to 3117.4 m.During drilling circulation loss was going up and drilling was finally stopped at 1630 hrs due to full loss at 3116 m, the well was circulated and a polymer pill was sent down the hole to push up the bottom fill.Drilling started again at 2045 hrs for 1hrs45min with full loss. Decision was taken to plug the LCZ.