Skip to main content

Daily News

Project Acronym: IDDP-2 | State: Completed | Expedition ID: 5029

ins.: 2017-01-02 01:00, 9 yrs ago
By: Scientists
Category: IDDP-2
IDDP-2

IDDP: 2017-01-02

Running in 7" liner was finished on December 30th. An ...
Drill rig Thor at IDDP-2 drill site in the background middle of photo. (Source: Gudmundur Omar Fridleifsson)

Running in 7" liner was finished on December 30th. An obstruction was encountered at about 4571 m so the liner was eventually set at 4571,5 m (4401 TVD). Liner hanger is at 2851,5 MD. Subsequently the 5" singles were laid down and placed on the ground at rig site. Following this operation on December 31st, 3 ½" singles were picked up and made into stands. This operation continued through the whole of yesterday and is still ongoing today. A temperature log will be executed once the 3 ½" stands are ready. .