IDDP: 2017-01-02
Running in 7" liner was finished on December 30th. An ...

Running in 7" liner was finished on December 30th. An obstruction was encountered at about 4571 m so the liner was eventually set at 4571,5 m (4401 TVD). Liner hanger is at 2851,5 MD. Subsequently the 5" singles were laid down and placed on the ground at rig site. Following this operation on December 31st, 3 ½" singles were picked up and made into stands. This operation continued through the whole of yesterday and is still ongoing today. A temperature log will be executed once the 3 ½" stands are ready. .
- Links:
- /fileadmin/icdp/projects/data/iddp/2017_01_02/DIS_OTHER.htm