Skip to main content
ins.: 2022-12-06 13:10; ( Age: 2 yrs )
By: Scientists
Category: DIVE
DIVE

DIVE: 2022-12-06

Fixing the wireline winch at current borehole depth of 522.4 m
A new tramway line to the drilling site? No, just fixing the wireline winch. The 200th core was extracted, and some euhedral sulphide crystals found inside a fracture. Current borehole depth is 522.4 m.

A new tramway line to the drilling site? No, just fixing the wireline winch. The 200th core was extracted, and some euhedral sulphide crystals found inside a fracture. Current borehole depth is 522.4 m.