Skip to main content
ins.: 2022-12-07 13:10; ( Age: 2 yrs )
By: sql
Category: DIVE
DIVE

DIVE: 2022-11-14

We past 300 m depth with a borehole deviation
We past 300 m depth with a borehole deviation of less than 1.5° from vertical, which is well within the wished tolerance. After a logging session over the weekend, we resumed drilling and changed from PQ to HQ diameter. Using HQ, we collected 15 m of cores in a single day shift. The foliation we observe now is at an angle from vertical.

We past 300 m depth with a borehole deviation of less than 1.5° from vertical, which is well within the wished tolerance. After a logging session over the weekend, we resumed drilling and changed from PQ to HQ diameter. Using HQ, we collected 15 m of cores in a single day shift. The foliation we observe now is at an angle from vertical.