Daily News
Project Acronym: WEIHE | State: Operational Phase | Expedition ID: 5074
▾▴ Toggle Texts
▾▴ Toggle Images
◱ Full Size Pics
⊻ Bottom of Page
... (?TBD)
(inserted: 01.09.2025 08:42)
Weihe: 2025-08-30 ˇ
Rainbow appearing on the Weihe Basin drilling site
(inserted: 29.08.2025 15:07)
Weihe: 2025-08-29 ˇ
The driller operating the rig already drilled more than 240 m
(inserted: 21.08.2025 11:55)
Weihe: 2025-08-20 ˇ
It is raining at the Weihe Basin drilling site
(inserted: 17.08.2025 12:51)
Weihe: 2025-08-17 ˇ
Drillers working on the drilling tower while reaching 125 m depth
(inserted: 16.08.2025 12:51)
Weihe: 2025-08-16 ˇ
To stay on top of things: Whiteboard information for cores 66-78
(inserted: 11.08.2025 12:51)
Weihe: 2025-08-11 ˇ
Drillers at work. Today they have reached about 80 m depth.
(inserted: 10.08.2025 12:51)
Weihe: 2025-08-10 ˇ
A team visiting the drill site while the drillers reach 73 m depth at the ICDP WEIHE drill site.
(inserted: 09.08.2025 12:51)
Weihe: 2025-08-09 ˇ
Busy times at the drill sites: drillers at work
(inserted: 08.08.2025 12:51)
Weihe: 2025-08-08 ˇ
Filled the whiteboard for the third time - having reached 47 m
(inserted: 06.08.2025 12:51)
Weihe: 2025-08-06 ˇ
Already filled a white board for the second time - drilling is progressing well
(inserted: 05.08.2025 12:51)
Weihe: 2025-08-05 ˇ
After one night of heavy rain, the drilling starts again.
(inserted: 05.08.2025 07:33)
Weihe: 2025-08-04 ˇ
A lovely bird that happened to appear on the Weihe Basin Deep Drilling Site by chance
(inserted: 04.08.2025 08:38)
Weihe: 2025-08-03 ˇ
The first stage of our drilling was finished
still waiting for the restart