Skip to main content

Daily News

Project Acronym: HSDPD | State: Completed | Expedition ID: 5053

ins.: 2014-11-14 23:00; ( Age: 10 yrs )
By: RSS Feed
Category: HSPDP
HSPDP

HSPDP: 2014-11-15

Drilling slowed considerably on the 14th-15th because of problems with ...
ProjectLogo

Drilling slowed considerably on the 14th-15th because of problems with supplying water to the drill site and the camp. Once water was supplied to the drill site drilling resumed on the morning of the 15th We were able to drill 2 runs (both clay, full recovery, current depth now 215.58 mbs) before the decision was made to halt drilling to conserve limited water supply.