Skip to main content

Daily News

Project Acronym: HSDPD | State: Completed | Expedition ID: 5053

ins.: 2013-07-09 22:00; ( Age: 11 yrs )
By: RSS Feed
Category: HSPDP
HSPDP

HSPDP: 2013-07-10

Jochem and Matx arrived about lunch on the 9th, set ...
Project Logo

Jochem and Matx arrived about lunch on the 9th, set up, and logged within HQ to 197m (with casing down to 187m). 202m of actually depth, plus the tool and cuttings built on top. DPI tried to jack out casing in the eve/night. On the morning of the 10th, the OSG guys logged in the casing alone and were only able to get down to 112m before it got stopped by the mud/cuttings. DPI spent the rest of the 10th jacking out casing. They were hoping to get it freed and pulled out and then open hole log as much as possible on the 11th. However in the late afternoon of the 10th while attempting to jack out the casing the casing separated and the rig moved. Because the hole is at an angle it then became impossible to remove the casing. So 197m of casing is remaining in the hole and the logging is finished now with only in-casing logs available (i.e. no mag. susceptibility).