Skip to main content

Daily News

Project Acronym: GOE-DEEP | State: In Operation | Expedition ID: 5075

ins.: 2017-09-01 02:00, 8 yrs ago
By: Scientists
Category: DSEIS_
DSEIS_

DSEIS: 2017-09-01

The drilling of the deep borehole at Moab Khotsong has ...
Checking the drilling site on level 95 in a depth of 2900m

The drilling of the deep borehole at Moab Khotsong has now advanced to a depth of 730 meters. We checked the drilling site on level 95 in a depth of 2900m and the latest cores.