Skip to main content

Daily News

Project Acronym: GOE-DEEP | State: In Operation | Expedition ID: 5075

ins.: 2017-04-19 02:00, 8 yrs ago
By: Scientists
Category: DSEIS_
DSEIS_

DSEIS: 2017-04-19

The hydraulic LM90 drill rig has been mobilized at Moab ...
(Credit: Bennie Liebenberg)

The hydraulic LM90 drill rig has been mobilized at Moab Khotsong mine. On the 19th April 2017, the first equipment were loaded on mine carts and transported underground to the drill site on 95 level. On the picture, the water pump and the wire line winch are loaded on a cart, ready to go down through the main shaft.