Skip to main content

Daily News

Project Acronym: GOE-DEEP | State: In Operation | Expedition ID: 5075

ins.: 2017-04-24 02:00, 8 yrs ago
By: Scientists
Category: DSEIS_
DSEIS_

DSEIS: 2017-04-24

On April 24th, all the equipment of the drill rig ...
(Credit: Bennie Liebenberg)

On April 24th, all the equipment of the drill rig has been transported to the site at about 2895 meters below surface. On the picture the power pack and the control panel are loaded on a mine cart.