Daily News
Project Acronym: GOE-DEEP | State: In Operation | Expedition ID: 5075
ins.: 2017-04-24 02:00, 8 yrs ago

Category:
DSEIS_

DSEIS: 2017-04-24
On April 24th, all the equipment of the drill rig ...

On April 24th, all the equipment of the drill rig has been transported to the site at about 2895 meters below surface. On the picture the power pack and the control panel are loaded on a mine cart.
- Links:
- /fileadmin/icdp/projects/data/dseis/2017_04_24/DIS_OTHER.htm