HSPDP, Turkana, Kenya, 2013-JUL
OSG performed downhole logging in the HSPDP project in three campaigns at 3 sites: Baringo/Tugen Hills, Turkana, and Magadi.
This is the 2nd OSG logging campaign at the second HSPDP site Turkana.
Difficult hole conditions at the Turkana site caused a stuck drill pipe that could not be removed and hence allowed only cased hole logging (GR/SGR & hole inclination).
HSPDP Turkana, Kenya 2013-JUL 0-197 m
Tools: GR, SGR, DIP (hole deviation)
Staff: Kück, Rey Abasolo