Daily News
Project Acronym: TADP | State: Moratorium | Expedition ID: 5066
ins.: 2026-08-05 08:53, 19 days ago

Category:
TADP

TADP: 2024-09-04
Drilling reached 924.30 m - After a preventive maintenance on the on the rig, while tripping back into the hole, the NQ string became stuck at 773 m on August 30. Numerous attempts were made to free the pipe, and by cutting the NQ string. After that, the TADP Executive Committee decided to begin well abandonment with cementing and securing all cased intervals. Drilling in the Marajó Basin reached a final depth of 924.30 m and recovered 735.45 m of core (80% recovery).

