Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 2 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2007-08-25

Time drilling of approximately 1 foot per hour commenced
Cuttings generated during the timed drilling are being collected and washed.

Time drilling of approximately 1 foot per hour commenced last night at approximately 7 PM at a depth of 10245 feet (measured depth). Tomorrow, once the side track is well established in the sandstone formation away from the concrete plug, the bottom hole assembly will be changed over to allow for more rapid directional drilling to the target depth..