Daily News
Project Acronym: SAFOD | State: Completed | Expedition ID: 5025
ins.: 2022-10-06 12:17, 3 yrs ago

Category:
SAFOD

SAFOD: 2004-07-01
Today drilling resumed after assembly of the Blow Out

Today drilling resumed after assembly of the Blow Out Preventer stack. We are now drilling with a 17.5 inch bit, and the rate of penetration has increased up to 20-25 ft/hr while drilling through weathered granite.
- Links:
- https://