Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17, 3 yrs ago
By: sql
Category: SAFOD
SAFOD

SAFOD: 2007-09-04

After successfully coring across the 10480 fault zone we
Serpentinite, fault gouge, veins, and faults are present in the core that crossed the 10480 fault zone.

After successfully coring across the 10480 fault zone, we have rotary drilled (dashed line in figure) to the measured depth to begin coring of the ""10830"" fault zone. After changing over to a coring assembly this afternoon, we should begin coring this evening. The first core should show up on deck tomorrow morning. Three core runs are currently scheduled for this fault zone.