Daily News
Project Acronym: SAFOD | State: Completed | Expedition ID: 5025
ins.: 2022-10-06 12:17, 3 yrs ago

Category:
SAFOD

SAFOD: 2007-09-04
After successfully coring across the 10480 fault zone we

After successfully coring across the 10480 fault zone, we have rotary drilled (dashed line in figure) to the measured depth to begin coring of the ""10830"" fault zone. After changing over to a coring assembly this afternoon, we should begin coring this evening. The first core should show up on deck tomorrow morning. Three core runs are currently scheduled for this fault zone.
- Links:
- https://