Skip to main content

Daily News

Project Acronym: MALLIK | State: Completed | Expedition ID: 5026

ins.: 2022-10-21 18:29; ( Age: 2 yrs )
By: sql
Category: Mallik

MALLIK: 2002-02-22

Wireline logging in the hydrate section of the Mallik
Today is the last sample analysis for the GFZ-FLECAS, Eric Spangenberg and Johannes Kulenkampff (GFZ) got their first cores last Tuesday and are performing experiments under simulated in situ conditions since this day. They prepared 20 plugs (47mm in diameter and 50mm in length ) out of 11 core samples. Although the power amplifier broke down, Eric and Joe where able to get good p-wave signals and for some samples also good s-wave signals. The measurements of electrical resistivity worked very well for all samples measured so far.

Wireline logging in the hydrate section of the Mallik 5L-38 well, was conducted from February 20 until today. The total operation time was almost 30 hours including the rig-up and rig-down times. Five logging tool configurations were run in the hole.