Daily News
Project Acronym: HOTSPOT | State: Completed | Expedition ID: 5036
ins.: 2011-11-22 01:00, 14 yrs ago

Category:
SnakeRiver

HOTSPOT: 2011-11-22
We restarted drilling operations on Monday, November 14. This is ...

We restarted drilling operations on Monday, November 14. This is last Big Push. Depth about 1188.7 meters, bottom hole temperature about 93C. November 20 -- were at 1364.6 meters below surface. There has been a lot of highly altered basalt that have a greenish tint to them. A lot of brecciated basalt, subaqueous hyaloclastites with sediment mixed in. Sometimes it appears to be a basalt but is very rich in a green clay. Drilling is going smoothly. They had to install a blow-out preventer (BOP) which is mandatory when they get higher temps. Last bottom hole temp 96.8ÂșC.
- Links:
- /fileadmin/icdp/projects/data/snake-river/2011_11_22/DIS_OTHER.htm