HOTSPOT: 2011-01-10

And we're back .. Happy New Year!!! And the drilling ...
Tarp tent over drill rig to prevent mud pumps from freezing up.

And we're back .. Happy New Year!!! And the drilling resumes. Nightly temperatures of -23 C have slowed down our startup. Warmed up to almost freezing later in week. We had some trouble getting back to bottom of hole - unstable sediment blockages - but are now on the bottom and coring ahead. Total depth as of midnight 6 Jan = 1633 meters below surface. We are continuing to drill in hope of encountering rhyolite, and will be evaluating our progress and costs every few days.