Skip to main content

Daily News

Project Acronym: CBAY | State: Completed | Expedition ID: 5001

ins.: 2005-12-03 23:00, 20 yrs ago
By: RSS Feed
Category: ChesapeakeBay
ChesapeakeBay

ChesapeakeBay: 2005-12-04

Coring ended at about 8:00 a.m., local time, on ...
Jim Murray (l.) and Roger Morin (r.) prepare the first logging tool.

Coring ended at about 8:00 a.m., local time, on December 4 at a final depth of 5,795 ft (1.1 miles, 1.77 km). Geophysical logging began soon after the end of coring.