ins.: 2022-06-08 07:45, 3 yrs ago

Category:
STAR

STAR: 2022-06-07
Reached 27 m today.

Reached 27 m today. Driller set conductor casing to 8 m and then drilled for the cased section. The outer casing is planned to a total depth of 79 m. Drilling times varied between 40 min and 83 min per 3m drill rod as the formation hardness fluctuated. Very few fracture zones so far.