STAR: 2022-05-31
Today the drillers began their mobilisation from site5 to site 6.
![](/fileadmin/icdp/projects/data/star/2022_05_31/IOD.jpg)
Today the drillers began their mobilisation from site5 to site 6. The GNSS borehole adapter was installed at site 5 and the water level in the sampling pipe is at 6.14 m. We trenched and buried the surface seismometer at TSM4 today.