ins.: 2022-05-23 09:26; ( Age: 2 yrs )
![STAR](/fileadmin/_processed_/c/7/csm_STAR--ProjectLogo_9b0d7d1c5f.jpg)
Category:
STAR
![STAR](/fileadmin/_processed_/c/7/csm_STAR--ProjectLogo_9b0d7d1c5f.jpg)
STAR: 2022-05-19
The drill rig and equipment moved to site 5
![](/fileadmin/icdp/projects/data/star/2022_05_19/IOD.jpg)
The drill rig and equipment moved to site 5 yesterday, the drill team spudded in this morning and set conductor casing. We drilled to 18m today. Casing target is 79 m. At site 4 the GPS adapter was welded to the wellhead and we measured the water in the pore pressure pipe at 17.4m.