Skip to main content
ins.: 2022-05-23 09:26; ( Age: 2 yrs )
By: Scientists
Category: STAR
STAR

STAR: 2022-05-19

The drill rig and equipment moved to site 5
Drill site five

The drill rig and equipment moved to site 5 yesterday, the drill team spudded in this morning and set conductor casing. We drilled to 18m today. Casing target is 79 m. At site 4 the GPS adapter was welded to the wellhead and we measured the water in the pore pressure pipe at 17.4m.