ins.: 2021-10-12 09:27; ( Age: 4 yrs )

Category:
STAR

STAR: 2021-10-11
The drillers reached 133 m today, flushed the hole until no polymer remained, and tripped out.

The drillers reached 133 m today, flushed the hole until no polymer remained, and tripped out. In the afternoon, the loggers ran temperature, natural gamma, a three-arm caliper, acoustic and optical televiewers, and full wave sonic. Meanwhile, we prepped the strainmeter for a night of testing and checked the seismometer functionality