The drilling went well today!
![](/fileadmin/icdp/projects/data/star/2021_10_09/IOD.jpg)
The drilling went well today! After reassessing the drillers confirmed that they were at 99 m depth at the time of casing. Today, drilling finished to 127 m. There were a few minor fractures downhole. On the geochemistry side of things, we took down the spectrometer. The photo shows Adriano (INGV) measuring the mud pit pH: it was basic like expected.