ins.: 2021-10-05 09:35; ( Age: 3 yrs )
Category:
STAR
STAR: 2021-10-03
The gas collection system was setup and drilling was resumed this morning.
The gas collection system was setup and drilling was resumed this morning. Near 73 m depth, there was no mudflow return due to the presence of fractures. It returned at around 80 m, however, with continued mud loss. With four water truck deliveries, the day ended at 92.5 m depth.