Ohrid
Ohrid: 2013-04-20
Though the wireline was broken at the last run during ...
Though the wireline was broken at the last run during the nightshift, the team managed to fish the tool and get the last core of hole 1C on deck. So hole 1C is closed now at 479.59 m sediment depth. Overall, ca 960 m (2 x 480 m) of sediment were drilled in a total of 17 days. With the dayshift, the borehole logging team went on deck of the barge and started with their preparations for logging. Now, it is time to do some maintenance on the barge and the equipment, to recover a little bit for the entire team, and to celebrate a bit the immense success obtained during the last three weeks.