Ohrid: 2013-05-10

The Macedonian harbour master inspected the platform today. Drilling progress ...
Asce tried a life suite while waiting for the drill rig to be repaired

The Macedonian harbour master inspected the platform today. Drilling progress is slow and needs many bags of bentonite. After the night shift arrived on the platform the hydraulic system of the drill rig failed but could be repaired after 5 hours. At 11 pm drilling continued.