Skip to main content

Daily News

Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2008-11-26 01:00, 17 yrs ago
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2008-11-26

Preparations for drilling stage 2 have been underway during the ...
The well top is being prepared to connect the BOP?s again.

Preparations for drilling stage 2 have been underway during the evening and night. The BOP stack was connected to the flange again and tested under pressure after work over at the well top was completed. Running down the drill string with 23" drill bit is underway and currently is the BHA being assembled.