Skip to main content

Daily News

Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2004-12-05 01:00, 21 yrs ago
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2004-12-05

The drill-string had to be retrieved again during the last ...
Geysir rig on RN-18 and J?tunn rig on RN-17, well RN-15 and the old salt refinery can be seen on the right hand side.

The drill-string had to be retrieved again during the last night due to a fauly shock absorber in the drill-string. The drill-string is being run down the hole and drilling will continue tonight. The present total depth of the well RN-17 is at 2084 and circulation losses were recorded around 11 l/s last night.