Skip to main content

Daily News

Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2004-11-19 01:00, 21 yrs ago
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2004-11-19

The final production casing depth was reached at 04:30 this ...
Jotunn drill rig last night

The final production casing depth was reached at 04:30 this morning at a depth of 901.5m. Open hole geophysical wireline logs will be run before setting down the 13 3/8" casing and cementing of the casing.